[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-889109":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},889109,574,1,"单选题","2019-60、根据《中华人民共和国放射性污染防治法》开发利用或关闭铀(针)矿前进行环境影响评价的有关规定，下列说法中，错误的是（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","关闭铺(针矿的单位，应当在办理退役审批手续前编制环境影响报告书，报国务院生态环境主管部门审查批准",false,{"key":16,"text":17,"correct":18},"B","开发利用伴生放射性矿的单位，应当在办理退役审批手续前编制环境影响报告书，报国务院生态环境主管部门审查批准",true,{"key":20,"text":21,"correct":14},"C","开发利用伴生放射性矿的单位，应当在申请领取采矿许可证前编制环境影响报告书，报省级以上人民政府生态环境主管部门审查批准",{"key":23,"text":24,"correct":14},"D","开发利用铀(钍)矿的单位，应当在申请领取采矿许可证前编制环境影响报告书，报国务院生态环境主管部门审查批准","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]