[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888877":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},888877,574,1,"单选题","2016-5.根据《中华人民共和国环境保护法》，下列说法中，符合建设项目防治污染设施与主体工程“三同时”规定的是（）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","为确保污染防治效果，某企业污染防治设施在主体工程试运行时也同时投入使用",true,{"key":16,"text":17,"correct":18},"B","某企业由于排污情况的不确定性，其废气处理设施在主体工程设计完成后，方启动设计",false,{"key":20,"text":21,"correct":18},"C","由于实际产能未能达到设计产能的一半，为节约能耗，某企业关停了两套废水处理设施中的一套",{"key":23,"text":24,"correct":18},"D","为持续提升污染防治效果，某企业自行改造与批准的环境影响评价文件要求不同的废气治理设施","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]