[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888871":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},888871,574,1,"单选题","2018-110、某建设项目未依法进行环境影响评价，根据《中华人民共和国环境保护法》，该项目不得（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","开工建设",true,{"key":16,"text":17,"correct":18},"B","开展施工准备",false,{"key":20,"text":21,"correct":18},"C","予以备案或核准",{"key":23,"text":24,"correct":18},"D","开展初步设计审查","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]