[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888838":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},888838,574,1,"单选题","根据《关于做好环境影响评价制度与排污许可制衔接相关工作的通知》，下列说法正确的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设项目验收合格之前，排污单位应当按照国家环境保护相关法律法规以及排污许可证申请与核发技术规范要求，不得无证排污或不按证排污",false,{"key":16,"text":17,"correct":14},"B","环境影响报告书(表)获得批准的建设项日，其环境影响报告书(表)以及审批文件中与污染物排放相关的主要内容应当纳入排污许可证",{"key":19,"text":20,"correct":14},"C","建设项目无证排污或不按证排污的，环保部门不得出具该项目验收合格的意见，验收报告中与污染物排放相关的主要内容应当纳入该项口验收完成当年排污许可i执行年报",{"key":22,"text":23,"correct":24},"D","排污许可证执行报告、台账记录以及自行监测执行情况等应作为开展建设项目环境影响后评价的重要依据",true,"",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]