[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888836":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},888836,574,1,"单选题","依据《关于以改善环境质量为核心加强环境影响评价管理的通知》，关于 建立\"三挂钩\"机制的说法，错误的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","现有工程已经造成明显环境问题，应提出有效的整改方案和\"以新帯老\"措施",false,{"key":16,"text":17,"correct":18},"B","对未达到环境质量目标考核要求的地区依法暂停审批该地区排放相应重点污染物的项目环评文件",true,{"key":20,"text":21,"correct":14},"C","对环境质量现状超标的地区，项目拟采取的措施不能满足区域环境质量改善目标要求的，依法不予审批其环评文件",{"key":23,"text":24,"correct":14},"D","对于现有同类型项目环境污染严重，致使环境容量接近承载力的地区，在现有问题整改到位前，依法暂停审批该地区同类行业的项目环评文件","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]