[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888820":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},888820,574,1,"单选题","根据《中华人民共和国环境影响评价法》，下列关于建设项目环境影响评价文件重新报批和重新审核的说法中，正确的是( )。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设项目投资主体发生变化，建设单位应当重新报批建设项目的环境影响评价文件",false,{"key":16,"text":17,"correct":18},"B","建设项目防治污染的措施发生重大变动，建设单位应当重新报批建设项目的环境影响评价文件",true,{"key":20,"text":21,"correct":14},"C","建设项目自环境影响评价文件批准之日起五年建成投产，其环境影响文件应当报原审批单位重新审核",{"key":23,"text":24,"correct":14},"D","建设项目自环境影响评价文件批准之日起三年，方决定该项目开工建设，其环境影响文件应当报原审批单位重新审核","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]