[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888805":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},888805,574,1,"单选题","根据《环境影响评价公众参与办法》，下列说法错误的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","核设施建设项目建造前的环境影响评价公众参与依照本办法有关规定执行。",false,{"key":16,"text":17,"correct":18},"B","堆芯热功率300兆瓦以上的反应堆设施和商用乏燃料后处理厂的建设单位应当听取该设施或者后处理厂半径20公里范围内公民、法人和其他组织的意见；",true,{"key":20,"text":21,"correct":14},"C","其他核设施和铀矿冶设施的建设单位应当根据环境影响评价的具体情况，在一定范围内听取公民、法人和其他组织的意见。",{"key":23,"text":24,"correct":14},"D","大型核动力厂建设项目的建设单位应当协调相关省级人民政府制定项目建设公众沟通方案，以指导与公众的沟通工作。","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]