[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888788":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},888788,574,1,"单选题","根据《规划环境影响评价条例》以及《关于做好矿产资源规划环境影响评价工作的通知》，下列规划中，需编制环境影响报告书的规划是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","全国地质勘查规划",false,{"key":16,"text":17,"correct":14},"B","全国矿产资源规划",{"key":19,"text":20,"correct":14},"C","某省稀土资源总体规划",{"key":22,"text":23,"correct":24},"D","某国家规划矿区开发利用规划",true,"",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]