[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888782":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},888782,574,1,"单选题","根据《规划环境影响评价条例》和有关文件，关于规划环评与项目环评联动机制的要求，下列说法中，错误的是( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","未进行环境影响评价的规划所包含的建设项目，不予受理其环境影响评价文件",false,{"key":16,"text":17,"correct":14},"B","规划环境影响评价结论应当作为规划所包括建设项目环境影响评价的重要依据",{"key":19,"text":20,"correct":21},"C","已经批准的规划进行修订的，应当重新进行环境影响评价，未开展环境影响评价的，不予受理规划中建设项目的环境影响评价文件",true,{"key":23,"text":24,"correct":14},"D","已开展了规划环评 包括的建设项目环境影响评价内容可以适当简化，简化的具体内容及需要进一步深入评价的内容都应在审查意见中明确","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]