[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888777":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},888777,574,1,"单选题","根据《规划环境影响评价条例》,审查小组提出对专项规划环境影响报告书进行修改并重新审查意见的情形不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","评价方法选择不当的",false,{"key":16,"text":17,"correct":14},"B","内容存在重大缺陷或者遗漏的",{"key":19,"text":20,"correct":14},"C","环境影响评价结论不明确、不合理或者错误的",{"key":22,"text":23,"correct":24},"D","规划实施可能造成重大不良环境影响,并且无法提出切实可行的预防或者减轻对策和措施的",true,"",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]