[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888616":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},888616,574,1,"单选题","依据《中华人民共和国水污染防治法》，在饮用水水源二级保护区已建成的排放污染物的建设项目，由县级以上人民政府责令（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","限期治理",false,{"key":16,"text":17,"correct":14},"B","搬迁改造",{"key":19,"text":20,"correct":14},"C","停产治理",{"key":22,"text":23,"correct":24},"D","拆除或关闭",true,"根据《中华人民共和国水污染防治法》（2017年修订）第六十六条规定，禁止在饮用水水源二级保护区内新建、改建、扩建排放污染物的建设项目；已建成的排放污染物的建设项目，由县级以上人民政府责令拆除或者关闭。在饮用水水源二级保护区内从事网箱养殖、旅游等活动的，应当按照规定采取措施，防止污染饮用水水体。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]