[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888541":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},888541,574,1,"单选题","根据《中华人民共和国水土保持法》，编制建设项目水土保持方案的责任主体是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","县级以上人民政府",false,{"key":16,"text":17,"correct":18},"B","该建设项目生产建设单位",true,{"key":20,"text":21,"correct":14},"C","该建设项目水行政主管部门",{"key":23,"text":24,"correct":14},"D","具备相应资质的专业编制水土保持方案的机构","《中华人民共和国水土保持法》第二十五条规定，在山区、丘陵区、风沙区以及水土保持规划确定的容易发生水土流失的其他区域开办可能造成水土流失的生产建设项目，生产建设单位应当编制水土保持方案，报县级以上人民政府水行政主管部门审批，并按照经审批的水土保持方案，采取水土流失预防和治理措施。没有能力编制水土保持方案的，应当委托具备相应技术条件的机构编制。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]