[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888372":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},888372,574,1,"单选题","依据《中华人民共和国水土保持法》，在（ ）以及水土保持规划确定的容易发生水土流失的其他区域开办可能造成水土流失的生产建设项目，生产建设单位应当编制水土保持方案。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","平原、丘陵区、风沙区",false,{"key":16,"text":17,"correct":14},"B","山区、丘陵区、草原区",{"key":19,"text":20,"correct":21},"C","山区、丘陵区、风沙区",true,{"key":23,"text":24,"correct":14},"D","山区、丘陵区、高原区","根据《中华人民共和国水土保持法》第二十五条规定，在山区、丘陵区、风沙区以及水土保持规划确定的容易发生水土流失的其他区域开办可能造成水土流失的生产建设项目，生产建设单位应当编制水土保持方案，报县级以上人民政府水行政主管部门审批，并按照经审批的水土保持方案，采取水土流失预防和治理措施。没有能力编制水土保持方案的，应当委托具备相应技术条件的机构编制。水土保持方案应当包括水土流失预防和治理的范围、目标、措施和投资等内容。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]