[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888279":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},888279,574,1,"单选题","依据《中华人民共和国防沙治沙法》，在沙化土地范围内进行铁路、公路等建设活动，依法必须提交的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","环境影响报告",true,{"key":16,"text":17,"correct":18},"B","建设单位施工组织计划",false,{"key":20,"text":21,"correct":18},"C","建设项目的可行性研究报告",{"key":23,"text":24,"correct":18},"D","可能引起土地沙化责任的造林种草规划","根据《中华人民共和国防沙治沙法》第二十一条规定，在沙化土地范围内从事各种开发建设活动的，都必须事先就该项目可能对当地及相关地区生态产生的影响进行评价，提交环境影响报告。环境影响报告应当包括有关防沙治沙的内容，所提防沙治沙措施和要求必须符合防沙治沙规划，要明确规定遏制土地沙化扩展趋势，逐步减少沙化土地的具体措施。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]