[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888202":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},888202,574,1,"单选题","依据《中华人民共和国放射性污染防治法》，国务院核设施主管部门会同国务院环境保护行政主管部门根据（ ），在环境影响评价的基础上编制放射性固体废物处置场所选址规划，报国务院批准后实施。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","环境条件的需要",false,{"key":16,"text":17,"correct":18},"B","地质条件和放射性固体废物处置的需要",true,{"key":20,"text":21,"correct":14},"C","地质条件的需要",{"key":23,"text":24,"correct":14},"D","放射性固体废物处置的需要","根据《中华人民共和国放射性污染防治法》第四十四条规定，国务院核设施主管部门会同国务院环境保护行政主管部门根据地质条件和放射性固体废物处置的需要，在环境影响评价的基础上编制放射性固体废物处置场所选址规划，报国务院批准后实施。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]