[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-888031":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},888031,574,1,"单选题","依据《中华人民共和国水污染防治法》，对超过COD排放总量控制指标的地区，环境保护主管部门应当暂停审批（ ）的环境影响评价文件。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","新建水电站",false,{"key":16,"text":17,"correct":18},"B","新建制浆造纸厂",true,{"key":20,"text":21,"correct":14},"C","新建输变电工程",{"key":23,"text":24,"correct":14},"D","铁路电气化改造工程","《中华人民共和国水污染防治法》第二十条规定，对超过重点水污染物排放总量控制指标或者未完成水环境质量改善目标的地区，省级以上人民政府环境保护主管部门应当会同有关部门约谈该地区人民政府的主要负责人，并暂停审批新增重点水污染物排放总量的建设项目的环境影响评价文件。约谈情况应当向社会公开。本题选项中，只有制浆造纸厂排放的重点水污染物是COD。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]