[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887961":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},887961,574,1,"单选题","某汽车整车扩建项目位于大气污染防治重点区域内，根据《汽车整车制造建设项目环境影响评价文件审批原则（试行）》，关于该项目环境保护设施和措施要求的说法，错误的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","焊接车间弧焊设备应采用焊接烟尘收集净化装置",false,{"key":16,"text":17,"correct":14},"B","冲压废料、废动力电池等一般工业固体废物应回收或综合利用",{"key":19,"text":20,"correct":14},"C","涂料车间脱脂等表面处理废液、电泳槽清洗废液应进行预处理",{"key":22,"text":23,"correct":24},"D","水性涂料等低挥发件有机物含量涂料占总涂料使用量比例不低干50%",true,"",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]