[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887936":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},887936,574,1,"单选题","对正在进行建设或已经投入生产或使用的建设项目，由于建设方案的变化或运行、生产方案的变化，导致实际情况与环境影响评价情况不符，针对其变化所进行的补充评价称为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","建设项目环境影响补充评价",false,{"key":16,"text":17,"correct":14},"B","建设项目环境影响综合评价",{"key":19,"text":20,"correct":21},"C","建设项目环境影响后评价",true,{"key":23,"text":24,"correct":14},"D","建设项目环境影响总评价","《中华人民共和国环境影响评价法》中所说的建设项目环境影响后评价，是指对正在进行建设或已经投入生产或使用的建设项目，在建设过程中或投产运行后，由于建设方案的变化或运行、生产方案的变化，导致实际情况与环境影响评价情况不符，针对其变化所进行的补充评价。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]