[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887909":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},887909,574,1,"单选题","某办公用房环境影响报告表经当地环境保护行政主管部门审批后，建设地点和建设规模均发生了重大变动。根据《中华人民共和国环境影响评价法》，建设单位的下列做法中，正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","该建设单位应重新报批办公用房环境影响评价文件",true,{"key":16,"text":17,"correct":18},"B","将环境影响报告表重新报该环境保护行政主管部门审核",false,{"key":20,"text":21,"correct":18},"C","对办公用房进行跟踪评价，及时采取防治环境污染的措施",{"key":23,"text":24,"correct":18},"D","在办公用房建成后向该环境保护行政主管部门申请竣工环保验收时出具变更说明","根据《中华人民共和国环境影响评价法》第二十四条规定，建设项目的环境影响评价文件经批准后，建设项目的性质、规模、地点、采用的生产工艺或者防治污染、防止生态破坏的措施发生重大变动的，建设单位应当重新报批建设项目的环境影响评价文件。建设项目的环境影响评价文件自批准之日起超过五年，方决定该项目开工建设的，其环境影响评价文件应当报原审批部门重新审核；原审批部门应当自收到建设项目环境影响评价文件之日起十日内，将审核意见书面通知建设单位。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]