[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887898":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},887898,574,1,"单选题","根据《环境保护局建设项目环境影响评价文件审批程序规定》，按照规定实行核准制的建设项目，建设单位应当在（ ）报批环境影响评价文件。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","报送可行性研究报告前",false,{"key":16,"text":17,"correct":18},"B","提交项目申请报告前",true,{"key":20,"text":21,"correct":14},"C","办理备案手续后和开工前",{"key":23,"text":24,"correct":14},"D","进行项目初步设计前","2004年12月，原国家环境保护总局、国家发展和改革委员会联合发布《关于加强建设项目环境影响评价分级审批的通知》（环发[2004]64号），规定实行审批制的建设项目应当在报送可行性研究报告前完成环境影响评价文件报批手续；实行核准制的建设项目，建设单位应当在提交项目申请报告前完成环境影响评价文件报批手续；实行备案制的建设项目，建设单位应当在办理备案手续后和项目开工前完成环境影响评价文件报批手续。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]