[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887897":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},887897,574,1,"单选题","东部甲乙两省交界的某油库原油贮区位于乙省，建设单位拟在甲省扩建入库原油输送能力。根据《建设项目环境影响评价文件分级审批规定》，负责该项目环境影响评价文件审批的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","环境保护部",true,{"key":16,"text":17,"correct":18},"B","甲省环境保护行政主管部门",false,{"key":20,"text":21,"correct":18},"C","乙省环境保护行政主管部门",{"key":23,"text":24,"correct":18},"D","管辖甲、乙两省的环境保护部督察中心","根据《建设项目环境影响评价文件分级审批规定》第五条规定，环境保护部负责审批下列类型的建设项目环境影响评价文件：①核设施、绝密工程等特殊性质的建设项目；②跨省、自治区、直辖市行政区域的建设项目；③由国务院审批或核准的建设项目，由国务院授权有关部门审批或核准的建设项目，由国务院有关部门备案的对环境可能造成重大影响的特殊性质的建设项目。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]