[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887888":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},887888,574,1,"单选题","依据《建设项目环境影响报告表（试行）》，环境影响报告表可不含有（ ）的内容。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","公众参与",true,{"key":16,"text":17,"correct":18},"B","环境影响分析",false,{"key":20,"text":21,"correct":18},"C","建设项目工程分析",{"key":23,"text":24,"correct":18},"D","环境影响评价结论与建议","依据《建设项目环境影响报告表（试行）》，环境影响报告表内容包括：①建设项目的基本情况；②建设项目所在地自然环境和社会环境简况；③环境质量状况；④评价适用标准；⑤建设项目工程分析；⑥项目主要污染物产生及预计排放情况；⑦环境影响分析；⑧建设项目拟采取的防治措施及预期治理效果；⑨结论与建议。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]