[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887887":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},887887,574,1,"单选题","依据环境影响评价法，已经进行了环境影响评价的规划所包含的具体建设项目，其环境影响评价内容（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","可以省略",false,{"key":16,"text":17,"correct":18},"B","可以简化",true,{"key":20,"text":21,"correct":14},"C","不可以简化",{"key":23,"text":24,"correct":14},"D","应该细化","《中华人民共和国环境影响评价法》第十八条规定，建设项目的环境影响评价，应当避免与规划的环境影响评价相重复。作为一项整体建设项目的规划，按照建设项目进行环境影响评价，不进行规划的环境影响评价。已经进行了环境影响评价的规划包含具体建设项目的，规划的环境影响评价结论应当作为建设项目环境影响评价的重要依据，建设项目环境影响评价的内容应当根据规划的环境影响评价审查意见予以简化。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]