[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887881":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},887881,574,1,"单选题","下列不属于建设项目环境影响报告表填报内容的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设项目的基本情况",false,{"key":16,"text":17,"correct":14},"B","环境影响分析",{"key":19,"text":20,"correct":14},"C","建设项目工程分析",{"key":22,"text":23,"correct":24},"D","建设项目环境保护措施",true,"建设项目环境影响报告表必须由具有环境影响评价资质的单位填写。填报内容包括：①建设项目的基本情况；②建设项目所在地自然环境和社会环境简况；③环境质量状况；④评价适用标准；⑤建设项目工程分析；⑥项目主要污染物产生及预计排放情况；⑦环境影响分析；⑧建设项目拟采取的防治措施及预期治理效果；⑨结论与建议。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]