[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887878":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},887878,574,1,"单选题","一项整体建设项目的规划是指一个具体的（ ），规划中一般包括多个建设项目。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设发展规划",true,{"key":16,"text":17,"correct":18},"B","建设项目规划",false,{"key":20,"text":21,"correct":18},"C","建设项目策划",{"key":23,"text":24,"correct":18},"D","建设发展计划","一项整体建设项目的规划是指一个具体的建设发展规划，规划中一般包括多个建设项目。规划中建设项目建设的地点、规模、产品、工艺都比较具体，尽管是在一段时间内陆续建设，但可以运用建设项目环境影响评价方法来预测其最终建成规模对环境可能造成的影响程度，也可以提出具体的防治污染及保护生态的措施，可视为分期建设、分期投产的一揽子项目。对这种建设项目规划，采用建设项目环境影响评价技术导则和管理程序更有利于做好规划项目的环境保护，因此应按建设项目进行环境影响评价，不按规划环境影响评价的程序进行规划环境影响评价。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]