[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887844":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},887844,574,1,"单选题","根据《规划环境影响评价条例》，规划环境影响报告书审查意见不包括( )。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","评价方法的适当性",false,{"key":16,"text":17,"correct":14},"B","环境影响评价结论的科学性",{"key":19,"text":20,"correct":21},"C","规划优化调整建议的合理性",true,{"key":23,"text":24,"correct":14},"D","预防或减轻不良环境影响的对策和措施的合理性和有效性","",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]