[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887836":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},887836,574,1,"单选题","据《规划环境影响评价条例》，规划实施区域的（ ），应当暂停审批该规划实施区域内新增该重点污染物排放总量的建设项目的环境影响评价文件。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","重点污染物排放浓度超过国家或者地方排放标准的",false,{"key":16,"text":17,"correct":14},"B","一般污染物排放总量超过国家或者地方规定的总量控制指标的",{"key":19,"text":20,"correct":21},"C","重点污染物排放总量超过国家或者地方规定的总量控制指标的",true,{"key":23,"text":24,"correct":14},"D","一般污染物排放浓度超过国家或者地方排放标准的","规划实施过程中产生重大不良环境影响的，规划编制机关、环境保护部门、规划审批机关等部门应及时采取措施，减轻不良影响。《规划环境影响评价条例》第三十条规定，规划实施区域的重点污染物排放总量超过国家或者地方规定的总量控制指标的，应当暂停审批该规划实施区域内新增该重点污染物排放总量的建设项目的环境影响评价文件。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]