[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887818":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},887818,574,1,"单选题","规划的环境影响报告书应该在（ ）完成，针对规划进行环境影响评价，才能实现环境影响评价的目的。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","规划草案编制",false,{"key":16,"text":17,"correct":14},"B","综合规划编制",{"key":19,"text":20,"correct":14},"C","环境影响的篇章或说明编制",{"key":22,"text":23,"correct":24},"D","专项规划基本编制",true,"规划的环境影响报告书是一个独立的文件，它应该在专项规划基本编制完成，针对规划进行环境影响评价，才能实现环境影响评价的目的。如果专项规划尚未编制完成就开始进行环境影响评价，评价对象不明确，针对性不强，就达不到评价预期的效果；如果在专项规划上报后再进行环境影响评价，就不能及时给上级审批机关提供科学决策的依据，同样使评价工作失去意义。对专项规划环境影响报告书与规划草案一并送审的规定，目的在于确保规划环境影响评价制度的执行，确保规划环境影响评价发挥作用。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]