[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887808":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},887808,574,1,"单选题","依据《中华人民共和国环境影响评价法》，对于已进行了环境影响评价的规划所包含的具体建设项目，以下表述正确的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","其环境评价可不进行",false,{"key":16,"text":17,"correct":14},"B","重新进行规划的环境影响评价",{"key":19,"text":20,"correct":21},"C","其环境影响评价内容可以简化",true,{"key":23,"text":24,"correct":14},"D","可不遵循规划环境影响评价对该建设项目提出的要求","按照《规划环境影响评价条例》规定，已经开展了环境影响评价的规划，其包含的建设项目环境影响评价的内容可以根据规划环境影响评价的分析论证情况予以适当简化，简化的具体内容以及需要进一步深入评价的内容都应在审查意见中明确。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]