[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887759":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},887759,574,1,"单选题","根据《“十三五”环境影响评价改革实施方案》，下列关于加强规划环评与项目环评联动的说法中，错误的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","依法将规划环评作为规划所包含项目环评文件审批的刚性约束",false,{"key":16,"text":17,"correct":14},"B","对已采纳规划环评要求的规划所包含的建设项目，简化相应环评内容",{"key":19,"text":20,"correct":14},"C","项目环评中发现规划实施造成重大不利环境影响的，应及时反馈规划编制机构",{"key":22,"text":23,"correct":24},"D","对高质量完成规划环评、各类管理清单清晰可行的产业园区，降低园区内环评文件的类别",true,"根据《“十三五”环境影响评价改革实施方案》，加强规划环评与项目环评联动。依法将规划环评作为规划所包含项目环评文件审批的刚性约束。对已采纳规划环评要求的规划所包含的建设项目，简化相应环评内容。对高质量完成规划环评、各类管理清单清晰可行的产业园区，试点降低园区内部分行业项目环评文件的类别。项目环评中发现规划实施造成重大不利环境影响的，应及时反馈规划编制机关。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]