[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887758":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},887758,574,1,"单选题","根据《“十三五”环境影响评价改革实施方案》，下列不属于提高建设项目环评效能的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","改革管理方式",false,{"key":16,"text":17,"correct":14},"B","严格项目管理",{"key":19,"text":20,"correct":21},"C","建立预警体系",true,{"key":23,"text":24,"correct":14},"D","提高公众参与有效性","《“十三五”环境影响评价改革实施方案》中提高建设项目环评效能的方法包括：改革管理方式、严格项目管理、提高公众参与有效性。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价相关法律法规","建筑工程",0]