[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-573-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":625},{"id":5,"name":6,"category":7,"favorite":8},573,"环境影响评价技术方法","建筑工程",0,20,50,1333,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,225,236,248,260,272,284,296,308,320,332,344,356,368,379,394,406,418,430,442,454,466,478,490,503,515,527,539,551,564,576,588,600,613],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},887348,1,"单选题","某园区现有20家企业，SO2年排放总量已达到规划环评许可量1000吨。现拟建SO2年排放量100吨的项目，该项目环保措施达到园区现有企业治理水平。环评总量核算在区域总量不变的前提下，基于公平原则，该项目SO2年排放总量和园区原20家企业排放总量合理的分配方案是（ ）。某园区现有20家企业，SO2年排放总量已达到规划环评许可量1000吨。现拟建SO2年排放量100吨的项目，该项目环保措施达到园区现有企业治理水平。环评总量核算在区域总量不变的前提下，基于公平原则，该项目SO2年排放总量和园区原20家企业排放总量合理的分配方案是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","100吨和900吨",false,{"key":24,"text":25,"correct":22},"B","100吨和1000吨",{"key":27,"text":28,"correct":22},"C","80吨和820吨",{"key":30,"text":31,"correct":32},"D","90.9吨和909.1吨",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},887349,"输油管线工程建设过程中，减少工程施工对植被影响的重要措施是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"加快施工进度",{"key":24,"text":41,"correct":22},"减少施工机械数量",{"key":27,"text":43,"correct":22},"缩短作业时段",{"key":30,"text":45,"correct":32},"缩小作业带宽度",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},887350,"城市生活污水二级处理厂，在排放前常采取消毒处理，最经济的消毒处理方法是（ ）",[50,52,54,56],{"key":20,"text":51,"correct":22},"臭氧法",{"key":24,"text":53,"correct":22},"紫外线法",{"key":27,"text":55,"correct":22},"双氧水法",{"key":30,"text":57,"correct":32},"二氧化氯法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":30,"analysis":33},887351,"某制药废水硝基苯类浓度为20mg\u002FL，不能有效处理硝基苯的工艺是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"微电解",{"key":24,"text":65,"correct":22},"厌氧水解",{"key":27,"text":67,"correct":22},"Fenton氧化",{"key":30,"text":69,"correct":32},"中和处理",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},887352,"某企业产生的有机废气中，挥发性有机化合物（VOCs）的体积分数约在0.6%，适宜处理该有机废气的方法有（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"吸附法",{"key":24,"text":77,"correct":32},"冷凝法",{"key":27,"text":79,"correct":22},"膜分离法",{"key":30,"text":81,"correct":22},"生物法",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},887353,"属于烟气干法脱硫措施的有（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"石灰石—石膏法",{"key":24,"text":89,"correct":32},"活性炭法",{"key":27,"text":91,"correct":22},"氨法",{"key":30,"text":93,"correct":22},"钙法",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":27,"analysis":33},887354,"序批式活性污泥SBR除磷时，应该选取的污泥负荷和充水比是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"高污泥负荷、低充水比",{"key":24,"text":101,"correct":22},"低污泥负荷、低充水比",{"key":27,"text":103,"correct":32},"高污泥负荷、高充水比",{"key":30,"text":105,"correct":22},"低污泥负荷、高充水比",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},887355,"某项目拟采用升流式厌氧污泥床反应器（UAS B）处理生产废水，消化气（沼气）应由（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"UASB底部收集并导出",{"key":24,"text":113,"correct":22},"UASB下部收集并导出",{"key":27,"text":115,"correct":22},"UASB中部收集并导出",{"key":30,"text":117,"correct":32},"UASB上部收集并导出",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":20,"analysis":33},887356,"房间内的吸声措施主要用于降低（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":32},"室内墙面反射的混响声",{"key":24,"text":125,"correct":22},"声源辐射的直达声",{"key":27,"text":127,"correct":22},"振动引起的结构噪声",{"key":30,"text":129,"correct":22},"消声器的再生噪声",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},887357,"某浓盐水深度处理回用设施拟采用首次工业化的分盐结晶技术，其措施有效性分析的基础数据来源应是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":32},"中试试验数据",{"key":24,"text":137,"correct":22},"文献资料数据",{"key":27,"text":139,"correct":22},"建成后实际检测数据",{"key":30,"text":141,"correct":22},"类比其他项目数据",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},887358,"某火电厂粉煤飞灰比电阻率为2×1012～2×1013Ω?cm，采用三室五电场静电除尘器除尘，需要对烟气进行的预处理措施是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"提高烟气流速",{"key":24,"text":149,"correct":22},"降低烟气流速",{"key":27,"text":151,"correct":32},"对烟气进行调质处理",{"key":30,"text":153,"correct":22},"调整三室之间烟气量的比例",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":30,"analysis":33},887359,"回收含碳五以上单一组分的高浓度有机废气，合适的工艺有（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"生物过滤",{"key":24,"text":161,"correct":22},"催化氧化",{"key":27,"text":163,"correct":22},"活性炭吸附",{"key":30,"text":165,"correct":32},"溶剂吸收",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},887360,"下列处理工艺，适用于芯片制造项目产生的含氟废水预处理的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"隔油",{"key":24,"text":173,"correct":32},"CaCl2混凝沉淀",{"key":27,"text":175,"correct":22},"序批式活性污泥法",{"key":30,"text":177,"correct":22},"生物接触氧化法",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},887361,"某汽车制造企业，使用“沸石转轮吸附浓缩+蓄热式热力焚烧炉（RTO）”工艺处理喷涂过程中产生的VOCs废气，其中沸石转轮的吸附效率为95%，RTO的处理效率为99%，则该套工艺处理VOCs废气的总效率为（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":32},"0.9405",{"key":24,"text":185,"correct":22},"0.9595",{"key":27,"text":187,"correct":22},"0.99",{"key":30,"text":189,"correct":22},"0.9995",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},887362,"某电厂凉水塔噪声对居民点产生影响，在凉水塔外侧安装了消声装置，为得到该装置对居民点的实际降噪效果，需测量的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"该装置的隔声量",{"key":24,"text":197,"correct":22},"该装置的消声量",{"key":27,"text":199,"correct":32},"该装置安装前后敏感点的声级",{"key":30,"text":201,"correct":22},"该装置安装前后的通风量",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},887363,"在同一水力梯度下，下列关于潜水含水层防污性能的说法，正确的有（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"含水层埋深越大，防污性能越弱",{"key":24,"text":209,"correct":32},"含水层渗透系数越大，防污性能越弱",{"key":27,"text":211,"correct":22},"含水层厚度越大，防污性能越弱",{"key":30,"text":213,"correct":22},"含水层介质颗粒越细，防污性能越弱",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},887364,"下列烟气脱硫方法中，不产生废水的方法是（ ）。",[218,219,221,223],{"key":20,"text":91,"correct":22},{"key":24,"text":220,"correct":22},"海水法",{"key":27,"text":222,"correct":32},"烟气循环流化床工艺",{"key":30,"text":224,"correct":22},"石灰石\u002F石灰—石膏法",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},887365,"下列废气除臭方法中，属于化学法的是（ ）。",[229,231,233,234],{"key":20,"text":230,"correct":22},"掩蔽法",{"key":24,"text":232,"correct":22},"重力法",{"key":27,"text":77,"correct":22},{"key":30,"text":235,"correct":32},"燃烧法",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":20,"analysis":33},887366,"某拟建项目排放SO2700t\u002Fa，NO21000t\u002Fa，烟粉尘200t\u002Fa，挥发性有机物（VOCs）30t\u002Fa。该项目所在城市2016年环境空气质量如下表所示。为满足项目的环境可行性，区域削减量最少的方案是（ ）。 污染物 SO2 NO2 PM10 PM2.5 2016年平均浓度μg\u002F 50 45 70 30 年平均浓度标准μg\u002F 60 40 75 35",[240,242,244,246],{"key":20,"text":241,"correct":32},"SO2不削减，NO2削减2000 t\u002Fa，烟粉尘不削减，VOCs不削减",{"key":24,"text":243,"correct":22},"SO2削减700 t\u002Fa，NO2削减1000 t\u002Fa，烟粉尘200 t\u002Fa，VOCs削减30 t\u002FA",{"key":27,"text":245,"correct":22},"SO2削减700 t\u002Fa，NO2削减2000 t\u002Fa，烟粉尘200 t\u002Fa，VOCs削减30 t\u002FA",{"key":30,"text":247,"correct":22},"SO2削减1400 t\u002Fa，NO2削减2000 t\u002Fa，烟粉尘400 t\u002Fa，VOCs削减60 t\u002FA",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},887367,"某燃烧废气中含有氯、重金属元素Cd等，且氯浓度较高，在废气治理中应优先考虑的是（ ）。",[252,254,256,258],{"key":20,"text":253,"correct":32},"用碱液吸收去除酸性气体",{"key":24,"text":255,"correct":22},"用活性炭吸附去除重金属CD",{"key":27,"text":257,"correct":22},"用酸液洗涤法去除酸性气体",{"key":30,"text":259,"correct":22},"用过滤法去除重金属CD",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":24,"analysis":33},887368,"制定建设项目环评公众参与调查方案时，应作为调查对象的是（ ）。",[264,266,268,270],{"key":20,"text":265,"correct":22},"建设项目筹建人员",{"key":24,"text":267,"correct":32},"可能受影响公众",{"key":27,"text":269,"correct":22},"建设项目施工单位",{"key":30,"text":271,"correct":22},"关心项目建设的国外机构",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":24,"analysis":33},887369,"为防某山谷型生活垃圾填埋场对下游1.5km处村庄水井的污染，可以采用的地下水污染水力控制措施为（ ）。",[276,278,280,282],{"key":20,"text":277,"correct":22},"加强填埋场滤液导排、收集和处理",{"key":24,"text":279,"correct":32},"填埋场坝下进行垂直帷幕",{"key":27,"text":281,"correct":22},"填埋场下游增设污染监控井",{"key":30,"text":283,"correct":22},"停止使用该填埋场",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":24,"analysis":33},887370,"从声源上降低噪声的措施是（ ）。",[288,290,292,294],{"key":20,"text":289,"correct":22},"敏感目标防护",{"key":24,"text":291,"correct":32},"选用低噪声设备",{"key":27,"text":293,"correct":22},"将噪声源置于地下",{"key":30,"text":295,"correct":22},"调整声源与敏感目标距离",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":30,"analysis":33},887371,"废水处理构筑物中调节池的作用是（ ）。",[300,302,304,306],{"key":20,"text":301,"correct":22},"调节水位高低",{"key":24,"text":303,"correct":22},"降解污染物",{"key":27,"text":305,"correct":22},"分离水中固体颗粒",{"key":30,"text":307,"correct":32},"均化水质水量",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":27,"analysis":33},887372,"关于氮氧化物去除工艺的说法，正确的是（ ）。",[312,314,316,318],{"key":20,"text":313,"correct":22},"SCR工艺将NOx还原为水和氮气，不需催化剂",{"key":24,"text":315,"correct":22},"SCR工艺将NOx还原为水和氨氮，需要催化剂",{"key":27,"text":317,"correct":32},"SNCR工艺将NOx还原为水和氮气，不需催化剂",{"key":30,"text":319,"correct":22},"SNCR工艺将NOx还原为水和氨氮，需要催化剂",{"id":321,"libraryId":5,"type":15,"typeLabel":16,"stem":322,"options":323,"answer":20,"analysis":33},887373,"城市污水处理厂事故池的作用是（ ）。",[324,326,328,330],{"key":20,"text":325,"correct":32},"容纳厂内生产事故废水",{"key":24,"text":327,"correct":22},"容纳厂内初期雨水",{"key":27,"text":329,"correct":22},"容纳消防备用水",{"key":30,"text":331,"correct":22},"容纳可能严重影响污水处理厂运行的接管废水",{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":24,"analysis":33},887374,"某项目配套建设的硫回收设施，其环境效益可用货币量化的是（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"工程总投资",{"key":24,"text":339,"correct":32},"硫的销售收入",{"key":27,"text":341,"correct":22},"土地费用",{"key":30,"text":343,"correct":22},"固定资产残值",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":27,"analysis":33},887375,"某高速公路建设项目竣工环保验收调查时，对公路垂直方向噪声衰减情况及声环境敏感区的环境噪声进行了监测，但未记录监测时的车流量。由监测统计分析结果可以确定（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":22},"公路噪声源强",{"key":24,"text":351,"correct":22},"防护措施降噪效果",{"key":27,"text":353,"correct":32},"公路噪声衰减规律",{"key":30,"text":355,"correct":22},"设计工况下的声环境达标距离",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":27,"analysis":33},887376,"建设项目污水处理设施竣工环境保护验收监测时，对于生产稳定且污染排放有规律的排放源，应以生产周期为采样周期，采样不得少于2个周期，每个周期内采样次数最少为（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"1次",{"key":24,"text":363,"correct":22},"2次",{"key":27,"text":365,"correct":32},"3次",{"key":30,"text":367,"correct":22},"6次",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":24,"analysis":33},887377,"某高速公路建设项目竣工环保验收调查时，进行了噪声衰减监测和声环境敏感区监测，未进行车流量监测。由监测统计分析结果可以给出噪声衰减规律和（ ）。",[372,374,376,377],{"key":20,"text":373,"correct":22},"设计工况环境保护目标达标状况",{"key":24,"text":375,"correct":32},"噪声影响状况",{"key":27,"text":351,"correct":22},{"key":30,"text":378,"correct":22},"设计工况声环境达标距离",{"id":380,"libraryId":5,"type":381,"typeLabel":382,"stem":383,"options":384,"answer":393,"analysis":33},887378,2,"多选题","某项目动力锅炉燃烧煤汞含量为0.112ppm（wt），烟气经除尘、脱硫、脱硝后排放。汞的排放去向有（ ）。",[385,387,389,391],{"key":20,"text":386,"correct":32},"烟气排放",{"key":24,"text":388,"correct":32},"脱硫石膏",{"key":27,"text":390,"correct":32},"除尘灰渣",{"key":30,"text":392,"correct":22},"锅炉排污水","ABC",{"id":395,"libraryId":5,"type":381,"typeLabel":382,"stem":396,"options":397,"answer":393,"analysis":33},887379,"在生活垃圾焚烧项目的工程分析中，应明确交代的相关内容有（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":32},"牢记低位发热量",{"key":24,"text":401,"correct":32},"厨余垃圾所占比例",{"key":27,"text":403,"correct":32},"垃圾含水率",{"key":30,"text":405,"correct":22},"垃圾收集方式",{"id":407,"libraryId":5,"type":381,"typeLabel":382,"stem":408,"options":409,"answer":393,"analysis":33},887380,"在风险识别中，有毒有害物质放散起因有（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":32},"火灾",{"key":24,"text":413,"correct":32},"爆炸",{"key":27,"text":415,"correct":32},"泄露",{"key":30,"text":417,"correct":22},"非正常工况排放",{"id":419,"libraryId":5,"type":381,"typeLabel":382,"stem":420,"options":421,"answer":393,"analysis":33},887381,"运用类比分析法进行建设项目生态影响评价时，选择类比对象的条件有（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":32},"工程性质、规模及范围与拟建项目基本相当",{"key":24,"text":425,"correct":32},"类比对象已竣工验收并运行一段时间",{"key":27,"text":427,"correct":32},"项目建设区生态环境基本相似",{"key":30,"text":429,"correct":22},"项目投资额度大致相等",{"id":431,"libraryId":5,"type":381,"typeLabel":382,"stem":432,"options":433,"answer":393,"analysis":33},887382,"清洁生产分析中，原辅材料选取可考虑的定性分析指标有（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":32},"毒性",{"key":24,"text":437,"correct":32},"可再生性",{"key":27,"text":439,"correct":32},"可回收利用性",{"key":30,"text":441,"correct":22},"原辅材料价格",{"id":443,"libraryId":5,"type":381,"typeLabel":382,"stem":444,"options":445,"answer":393,"analysis":33},887383,"某石灰石矿山原矿区已开采完毕，将外延扩建新矿区，工程分析时应考虑（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":32},"新矿区征用的土地量",{"key":24,"text":449,"correct":32},"原矿山的渣场",{"key":27,"text":451,"correct":32},"新矿区办公楼的建筑面积",{"key":30,"text":453,"correct":22},"原矿山采矿机械设备",{"id":455,"libraryId":5,"type":381,"typeLabel":382,"stem":456,"options":457,"answer":393,"analysis":33},887384,"采用类比法确定某污水处理厂污泥产生量，类比对象应具有的条件有（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":32},"处理规模相似",{"key":24,"text":461,"correct":32},"处理工艺路线相似",{"key":27,"text":463,"correct":32},"接纳污水水质特征相似",{"key":30,"text":465,"correct":22},"污水收集范围大小相似",{"id":467,"libraryId":5,"type":381,"typeLabel":382,"stem":468,"options":469,"answer":393,"analysis":33},887385,"下列自然或人为活动中，可能成为生态风险源的有（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":32},"地质灾害",{"key":24,"text":473,"correct":32},"外来物种引入",{"key":27,"text":475,"correct":32},"生物技术应用",{"key":30,"text":477,"correct":22},"农田土壤改良",{"id":479,"libraryId":5,"type":381,"typeLabel":382,"stem":480,"options":481,"answer":393,"analysis":33},887386,"下列属于水库建设项目工程分析内容的有（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":32},"坝址方案比选",{"key":24,"text":485,"correct":32},"施工方式",{"key":27,"text":487,"correct":32},"水库淹没占地",{"key":30,"text":489,"correct":22},"鱼类调查计划",{"id":491,"libraryId":5,"type":381,"typeLabel":382,"stem":492,"options":493,"answer":502,"analysis":33},887387,"工程分析中应给出环境影响预测的污染源参数有（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":32},"产污节点图",{"key":24,"text":497,"correct":32},"污染源坐标和源强",{"key":27,"text":499,"correct":32},"污染物年排放时间",{"key":30,"text":501,"correct":32},"污染物年排放总量","ABCD",{"id":504,"libraryId":5,"type":381,"typeLabel":382,"stem":505,"options":506,"answer":502,"analysis":33},887388,"生态影响型项目工程分析应包括的内容有工程建设性质、工程投资及（ ）等。",[507,509,511,513],{"key":20,"text":508,"correct":32},"占地类型和面积",{"key":24,"text":510,"correct":32},"施工方案",{"key":27,"text":512,"correct":32},"弃渣量",{"key":30,"text":514,"correct":32},"施工废水排放量",{"id":516,"libraryId":5,"type":381,"typeLabel":382,"stem":517,"options":518,"answer":502,"analysis":33},887389,"表征建设项目生产工艺清洁生产水平的指标有（ ）。",[519,521,523,525],{"key":20,"text":520,"correct":32},"单位产品污染物产生量",{"key":24,"text":522,"correct":32},"单位产品新鲜水消耗量",{"key":27,"text":524,"correct":32},"单位产品电能、热能消耗量",{"key":30,"text":526,"correct":32},"单位产品原料消耗量",{"id":528,"libraryId":5,"type":381,"typeLabel":382,"stem":529,"options":530,"answer":502,"analysis":33},887390,"在非污染型建设项目环境影响评价中，需特别关注项目影响区的（ ）。",[531,533,535,537],{"key":20,"text":532,"correct":32},"植被特征",{"key":24,"text":534,"correct":32},"土地利用现状",{"key":27,"text":536,"correct":32},"土地利用规划",{"key":30,"text":538,"correct":32},"生态敏感目标的位置",{"id":540,"libraryId":5,"type":381,"typeLabel":382,"stem":541,"options":542,"answer":502,"analysis":33},887391,"某技改扩建项目拟依托原有公辅工程，其治理措施可行性分析应考虑的因素有（ ）。",[543,545,547,549],{"key":20,"text":544,"correct":32},"能力匹配性",{"key":24,"text":546,"correct":32},"工艺可行性",{"key":27,"text":548,"correct":32},"经济合理性",{"key":30,"text":550,"correct":32},"现行环保政策相符性",{"id":552,"libraryId":5,"type":381,"typeLabel":382,"stem":553,"options":554,"answer":563,"analysis":33},887392,"在评述建设项目清洁生产水平时，应分析（ ）。",[555,557,559,561],{"key":20,"text":556,"correct":32},"资源利用指标",{"key":24,"text":558,"correct":32},"污染物产生指标",{"key":27,"text":560,"correct":22},"环保治理工艺先进性",{"key":30,"text":562,"correct":32},"生产工艺先进性","ABD",{"id":565,"libraryId":5,"type":381,"typeLabel":382,"stem":566,"options":567,"answer":563,"analysis":33},887393,"某煤制烯烃项目由备煤、气化、变换、净化、甲醇合成、甲醇制烯烃、硫回收、污水处理场等单元组成。该项目排放硫化氢的无组织排放单元有（ ）。",[568,570,572,574],{"key":20,"text":569,"correct":32},"气化",{"key":24,"text":571,"correct":32},"硫回收",{"key":27,"text":573,"correct":22},"甲醇制烯烃",{"key":30,"text":575,"correct":32},"污水处理场",{"id":577,"libraryId":5,"type":381,"typeLabel":382,"stem":578,"options":579,"answer":563,"analysis":33},887394,"油气开发项目工程分析除运营期外，还应包括的时段有（ ）。",[580,582,584,586],{"key":20,"text":581,"correct":32},"勘察设计期",{"key":24,"text":583,"correct":32},"施工期",{"key":27,"text":585,"correct":22},"试运营期",{"key":30,"text":587,"correct":32},"退役期",{"id":589,"libraryId":5,"type":381,"typeLabel":382,"stem":590,"options":591,"answer":563,"analysis":33},887395,"高速公路建设项目建设期对生态环境的影响主要有（ ）。",[592,594,596,598],{"key":20,"text":593,"correct":32},"植被破坏",{"key":24,"text":595,"correct":32},"水土流失",{"key":27,"text":597,"correct":22},"动物迁徙通道阻隔",{"key":30,"text":599,"correct":32},"景观破坏",{"id":601,"libraryId":5,"type":381,"typeLabel":382,"stem":602,"options":603,"answer":612,"analysis":33},887396,"下列工况中，属于非正常排放的有（ ）。",[604,606,608,610],{"key":20,"text":605,"correct":32},"部分设备检修时排放",{"key":24,"text":607,"correct":22},"设备偶发的瞬时排放",{"key":27,"text":609,"correct":32},"开、停车时排放",{"key":30,"text":611,"correct":22},"储罐呼吸排放","AC",{"id":614,"libraryId":5,"type":381,"typeLabel":382,"stem":615,"options":616,"answer":612,"analysis":33},887397,"高速公路建设项目工程分析中，勘察期应重点关注（ ）。",[617,619,621,623],{"key":20,"text":618,"correct":32},"项目与沿线自然保护区的位置关系",{"key":24,"text":620,"correct":22},"施工方式和施工时间",{"key":27,"text":622,"correct":32},"与城镇规划的关系",{"key":30,"text":624,"correct":22},"交通噪声影响",[626,629,632,635,638,641],{"id":15,"name":627,"category":7,"favorite":628},"领导干部任职前廉政法规知识测试题",92,{"id":630,"name":631,"category":7,"favorite":15},595,"建筑结构与设备",{"id":633,"name":634,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":636,"name":637,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":639,"name":640,"category":7,"favorite":8},534,"BIM工程师",{"id":642,"name":640,"category":7,"favorite":8},535]