[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-573-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":615},{"id":5,"name":6,"category":7,"favorite":8},573,"环境影响评价技术方法","建筑工程",0,16,50,1333,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,285,294,306,318,330,342,354,366,378,390,402,414,426,438,448,460,471,483,495,507,519,531,543,555,567,579,591,603],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},887148,1,"单选题","河口现状水质调查时，每个水期每个断面至少需采样（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","1次",false,{"key":24,"text":25,"correct":22},"B","2次",{"key":27,"text":28,"correct":29},"C","4次",true,{"key":31,"text":32,"correct":22},"D","8次","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},887149,"某城镇生活污水处理厂配套建设室内污泥堆肥场，其对外环境的主要环境影响来源于（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"污泥发酵恶臭气体排放",{"key":24,"text":41,"correct":22},"堆肥产生的废水排放",{"key":27,"text":43,"correct":22},"堆肥产生的热量散发",{"key":31,"text":45,"correct":22},"污水处理产生的恶臭气体",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},887150,"某市建成区南北长10km，东西宽10km。某日AQI指数为101，环境空气质量为轻度污染水平，当天平均混合层高度为200m，风向为北风，平均风速为3m\u002Fs。预计第二天平均混合层高度为600m，风向仍为北风，平均风速下降到2 m\u002Fs，在污染源排放不变的情况下，第二天环境空气质量预计是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"重度污染",{"key":24,"text":53,"correct":22},"中度污染",{"key":27,"text":55,"correct":22},"维持轻度污染",{"key":31,"text":57,"correct":29},"空气质量好转",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},887151,"矩阵法环境影响识别表中，建设项目各建设阶段与环境要素交叉的格点，表示的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"影响因子",{"key":24,"text":65,"correct":22},"影响范围",{"key":27,"text":67,"correct":29},"影响要素",{"key":31,"text":69,"correct":22},"影响程度",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},887152,"某隧道工程穿超石灰岩地区，在环境影响评价中应特别重视（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":29},"水文地质条件",{"key":24,"text":77,"correct":22},"隧道长度",{"key":27,"text":79,"correct":22},"出渣量",{"key":31,"text":81,"correct":22},"爆破方式",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":20,"analysis":33},887153,"公路建设项目对动物的影响分析，应重点关注的问题是（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":29},"动物栖息地",{"key":24,"text":89,"correct":22},"动物种群数量",{"key":27,"text":91,"correct":22},"动物年龄结构",{"key":31,"text":93,"correct":22},"动物繁殖能力",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},887154,"采用定向钻方法进行穿越河流的天然气管线施工，需关注的主要环境问题是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":29},"施工对河流底栖生物的影响",{"key":24,"text":101,"correct":22},"泥浆产生的环境影响",{"key":27,"text":103,"correct":22},"施工爆破产生的振动影响",{"key":31,"text":105,"correct":22},"施工产生的噪声影响",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},887155,"铅酸蓄电池项目环境影响评价，环境空气现状监测的特征因子是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"二氧化硫",{"key":24,"text":113,"correct":22},"镍尘",{"key":27,"text":115,"correct":22},"氟化物",{"key":31,"text":117,"correct":29},"铅尘",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},887156,"评价某新建炼化一体化项目的清洁生产水平时，可作为参考依据的物耗、能耗指标是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"同行业任意企业的临时测试数据",{"key":24,"text":125,"correct":22},"同行业任意企业的基础数据",{"key":27,"text":127,"correct":22},"同行业有代表性企业临时测试数据",{"key":31,"text":129,"correct":29},"同行业有代表性企业近年的基础数据",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},887157,"已知项目污染因子及河流特征指数如表2所示，污染因子ISE指数从大到小排序正确的是（ ）。 表2 A.CO D、氨氮、总磷 B.氨氮、CO",[134,136,138,140],{"key":20,"text":135,"correct":29},"总磷",{"key":24,"text":137,"correct":22},"氨氮、总磷、COD",{"key":27,"text":139,"correct":22},"CO",{"key":31,"text":141,"correct":22},"总磷、氨氮",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},887158,"下列污染源中须要分析评价烟气下洗影响的污染源是（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"电解铝车间排烟",{"key":24,"text":149,"correct":29},"电厂烟塔合一排烟",{"key":27,"text":151,"correct":22},"燃气锅炉10m烟囱排烟",{"key":31,"text":153,"correct":22},"石化项目加热炉80m排气筒排烟",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},887159,"南方某具有年调节性质的高坝水电站项目进行环境影响识别，下列环境影响中影响最小的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":29},"下泄水量变化对下游用水设施影响",{"key":24,"text":161,"correct":22},"下泄水温变化对下游农灌作物影响",{"key":27,"text":163,"correct":22},"河道减水对陆生生态影响",{"key":31,"text":165,"correct":22},"河道减水对水生生态影响",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},887160,"在污染型项目清洁生产分析中，表征项目资源能源利用水平的指标有单位产品的原料消耗量、综合能耗以及（ ）等。",[170,172,174,176],{"key":20,"text":171,"correct":22},"水污染物排放量",{"key":24,"text":173,"correct":29},"新鲜水耗水量",{"key":27,"text":175,"correct":22},"烟气粉尘利用率",{"key":31,"text":177,"correct":22},"废水排放量",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},887161,"建设项目环境影响识别中，必须包括的阶段是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"项目选址期",{"key":24,"text":185,"correct":29},"建设期和运营期",{"key":27,"text":187,"correct":22},"项目初步设计期",{"key":31,"text":189,"correct":22},"产业链规划期",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},887162,"大气环境影响评价中，关于气象观测资料调查的说法，正确的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"对于各级评价项目均应调查近10年的气候统计资料",{"key":24,"text":197,"correct":29},"二级评价项目须调查地面气象观测资料和高空气象探测资料",{"key":27,"text":199,"correct":22},"二级评价补充气象观测的时间至少应连续一年",{"key":31,"text":201,"correct":22},"三级评价需收集近三年内的至少连续一年的气象资料",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},887163,"适用于评价范围大于50km的大气环境影响预测模式是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"ADMS模式",{"key":24,"text":209,"correct":22},"AERMAP模式",{"key":27,"text":211,"correct":22},"AERMOD模式",{"key":31,"text":213,"correct":29},"CALPUFF模式",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},887164,"某项目废气经净化装置处理后送50m高排气筒排放，H2S和NH3的排放速率分别为2kg\u002Fh和34kg\u002Fh，烟气量为100000m3\u002Fh，若不考虑化学转化，经预测该污染源对关心点X的H2S最大小时平均浓度预测值为5.0μg\u002Fm3，则其对X点的NH3最大小时平均浓度预测值是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"10.0μg\u002Fm3",{"key":24,"text":221,"correct":22},"74.0μg\u002Fm3",{"key":27,"text":223,"correct":29},"85.0μg\u002Fm3",{"key":31,"text":225,"correct":22},"170.0μg\u002Fm3",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},887165,"某炼化一体化项目，炼油、化工生产装置分别布置在两个区块，通过约7km管廊互供物料。该项目大气环境防护距离的确定应（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":22},"作为一个生产单元估算",{"key":24,"text":233,"correct":29},"按两区块分别估算",{"key":27,"text":235,"correct":22},"仅按炼油装置区估算",{"key":31,"text":237,"correct":22},"仅按化工装置区估算",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":27,"analysis":33},887166,"某电厂粉煤灰堆场可视为面源，下列参数中属于该灰场污染源调查参数的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"初始横向扩散参数",{"key":24,"text":245,"correct":22},"初始纵向扩散参数",{"key":27,"text":247,"correct":29},"面源初始排放高度",{"key":31,"text":249,"correct":22},"废气排放速度",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":20,"analysis":33},887167,"大气环境影响预测中，用于计算烟气出口速度的烟气量是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":29},"标态烟气量",{"key":24,"text":257,"correct":22},"干烟气量",{"key":27,"text":259,"correct":22},"湿烟气量",{"key":31,"text":261,"correct":22},"工况烟气量",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},887168,"某高架点源排放的SO2、NOx源强相等，即QSO2=QNOx，仅考虑NO2／NOx=0.9，下列关于该点源小时浓度预测结果说法正确的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"SO2、NO2最大地面浓度相等",{"key":24,"text":269,"correct":22},"SO2最大地面浓度是NO20.9倍",{"key":27,"text":271,"correct":22},"SO2、NO2最大地面浓度占标率相等",{"key":31,"text":273,"correct":29},"SO2、NO2最大地面浓度出现距离相等",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},887169,"计算烟气出口速度应使用的烟气量是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":29},"标准状态烟气量",{"key":24,"text":281,"correct":22},"理论烟气量",{"key":27,"text":283,"correct":22},"实际烟气量",{"key":31,"text":257,"correct":22},{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":20,"analysis":33},887170,"某建设项目大气环境影响评价需预测的关心点与项目厂界距离为55km，适用于该关心点浓度预测的模式是（ ）。",[289,290,291,292],{"key":20,"text":213,"correct":29},{"key":24,"text":207,"correct":22},{"key":27,"text":211,"correct":22},{"key":31,"text":293,"correct":22},"估算模式",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},887171,"下列参数中，ADMS、AERMO D、CALPUFF模式均需要的模式参数是（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"最小M-O长度",{"key":24,"text":301,"correct":29},"地表粗糙度",{"key":27,"text":303,"correct":22},"地表反照率",{"key":31,"text":305,"correct":22},"BOWEN比",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":27,"analysis":33},887172,"采用AERMOD模式进行大气影响预测时，必须输入的气象参数为（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"日照时数",{"key":24,"text":313,"correct":22},"蒸发量",{"key":27,"text":315,"correct":29},"干球温度",{"key":31,"text":317,"correct":22},"太阳辐射强度",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":31,"analysis":33},887173,"下列参数中，不属于大气环境影响估算模式预测面源影响所需的是（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":22},"面源排放速率",{"key":24,"text":325,"correct":22},"面源排放高度",{"key":27,"text":327,"correct":22},"面源长度",{"key":31,"text":329,"correct":29},"面源初始横向扩散参数",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":27,"analysis":33},887174,"某项目拟建于占地面积为50km2的围海造地规划工业园区内，距海岸5km，其大气环境影响评价工作等级为二级，采用AERMOD模式预测大气环境影响，下垫面参数选择正确的是（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":22},"选择城市地区的近地面参数",{"key":24,"text":337,"correct":22},"选择耕地地区的近地面参数",{"key":27,"text":339,"correct":29},"选择水面地区的近地面参数",{"key":31,"text":341,"correct":22},"选择沙漠地区的近地面参数",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":31,"analysis":33},887175,"大气污染源调查中，不应列入点源调查清单的是（ ）。",[346,348,350,352],{"key":20,"text":347,"correct":22},"点源坐标",{"key":24,"text":349,"correct":22},"排气筒出口内径",{"key":27,"text":351,"correct":22},"排放工况",{"key":31,"text":353,"correct":29},"环境温度",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":27,"analysis":33},887176,"某拟建项目排放大气污染物的最大地面浓度出现距离Dmax和地面浓度达到标准限值10％时对应的最远距离D10％如表3所示。根据《环境影响评价技术导则大气环境》，大气评价范围边长为（ ）。 表3",[358,360,362,364],{"key":20,"text":359,"correct":22},"32km",{"key":24,"text":361,"correct":22},"36km",{"key":27,"text":363,"correct":29},"50km",{"key":31,"text":365,"correct":22},"56km",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":31,"analysis":33},887177,"某大气二级评价项目，在敏感目标甲小区的SO2小时平均浓度现状监测值和预测贡献值见表4。甲小区的SO2小时平均浓度影响叠加值是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":22},"0.038mg\u002Fm3",{"key":24,"text":373,"correct":22},"0.050mg\u002Fm3",{"key":27,"text":375,"correct":22},"0.068mg\u002Fm3",{"key":31,"text":377,"correct":29},"0.080mg\u002Fm3",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":20,"analysis":33},887178,"某拟建项目的SO2大气环境影响预测结果见表5。典型日气象条件的对应日期是（ ）。 表5",[382,384,386,388],{"key":20,"text":383,"correct":29},"5月4日、7月2日",{"key":24,"text":385,"correct":22},"7月2日、2月20日",{"key":27,"text":387,"correct":22},"2月20日、5月4日",{"key":31,"text":389,"correct":22},"2月20日、5月4日、7月2日",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":27,"analysis":33},887179,"由右侧温廓线图（见图2）可以确定（ ）。 图2",[394,396,398,400],{"key":20,"text":395,"correct":22},"逆温层的厚度为1000m",{"key":24,"text":397,"correct":22},"逆温层的厚度为200m",{"key":27,"text":399,"correct":29},"逆温层底的高度为200m",{"key":31,"text":401,"correct":22},"逆温层底的高度为1000m",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":20,"analysis":33},887180,"大气颗粒物源项按气态考虑时，其粒径应（ ）。",[406,408,410,412],{"key":20,"text":407,"correct":29},"小于15μm",{"key":24,"text":409,"correct":22},"小于30μm",{"key":27,"text":411,"correct":22},"小于50μm",{"key":31,"text":413,"correct":22},"小于100μm",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":20,"analysis":33},887181,"某铜冶炼企业，大气环境影响评价等级为二级，非正常工况应预测（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":29},"小时平均浓度",{"key":24,"text":421,"correct":22},"日平均浓度",{"key":27,"text":423,"correct":22},"植物生长季平均浓度",{"key":31,"text":425,"correct":22},"年平均浓度",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":24,"analysis":33},887182,"下列模式中，用于计算SO2转化为硫酸盐的模式是（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":22},"AERMET",{"key":24,"text":433,"correct":29},"CALPUFF",{"key":27,"text":435,"correct":22},"AERMAP",{"key":31,"text":437,"correct":22},"AERMOD",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":31,"analysis":33},887183,"下列参数中，属于ADMS模式预测必须输入的参数是（ ）。",[442,444,446,447],{"key":20,"text":443,"correct":22},"地面补充观测气象数据",{"key":24,"text":445,"correct":22},"高空气象数据",{"key":27,"text":303,"correct":22},{"key":31,"text":301,"correct":29},{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},887184,"某项目大气环境影响评价中，某一环境敏感点的相关资料如表2，该点的NO2小时平均浓度影响叠加值为（ ）。 表2",[452,454,456,458],{"key":20,"text":453,"correct":22},"0.038mg\u002FNm3",{"key":24,"text":455,"correct":22},"0.046 mg\u002FNm3",{"key":27,"text":457,"correct":22},"0.048 mg\u002FNm3",{"key":31,"text":459,"correct":29},"0.056 mg\u002FNm3",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":31,"analysis":33},887185,"某建设项目大气污染源可视为体源，采用估算模式确定项目的评价等级时，必须输入（ ）。",[464,465,467,469],{"key":20,"text":301,"correct":22},{"key":24,"text":466,"correct":22},"排放温度",{"key":27,"text":468,"correct":22},"平均风速",{"key":31,"text":470,"correct":29},"排放高度",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":20,"analysis":33},887186,"某河流的水质监测断面如图3所示，选用两点法测定河流的耗氧系数K1时，应采用（ ）断面平均水质监测数据。",[475,477,479,481],{"key":20,"text":476,"correct":29},"1、2",{"key":24,"text":478,"correct":22},"2、3",{"key":27,"text":480,"correct":22},"3、4",{"key":31,"text":482,"correct":22},"5、3",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":20,"analysis":33},887187,"设计流量Q条件下的河段水动力参数，一般根据实测水文资料率定的α1、β1、α2、β2、α3、β3参数，按下列经验公式估计：断面平均流速：u=α1Qβ1；断面平均水深：h=α2Qβ2；断面水面宽：B=α3Qβ3。当采用零维、一维、二维稳态水质模型预测设计流量条件下的河流水质浓度时，三个模型至少分别需要（ ）上述参数。",[487,489,491,493],{"key":20,"text":488,"correct":29},"0个、2个、4个",{"key":24,"text":490,"correct":22},"1个、2个、4个",{"key":27,"text":492,"correct":22},"1个、3个、5个",{"key":31,"text":494,"correct":22},"2个、4个、6个",{"id":496,"libraryId":5,"type":15,"typeLabel":16,"stem":497,"options":498,"answer":20,"analysis":33},887188,"某拟建项目排污口对岸现有一个污水排放量为3.6万t\u002Fd的排污口，COD的排放浓度为100mg\u002FL。河流上游枯水期设计流量为10m3\u002Fs，COD背景浓度15mg\u002FL。该项目设计污水量为10.0万t\u002Fd，COD排放浓度为50mg\u002FL。则采用一维稳态水质模型计算得到的排放断面COD起始浓度为（ ）。",[499,501,503,505],{"key":20,"text":500,"correct":29},"21.56mg\u002FL",{"key":24,"text":502,"correct":22},"24.95mg\u002FL",{"key":27,"text":504,"correct":22},"42.80mg\u002FL",{"key":31,"text":506,"correct":22},"55.00mg\u002FL",{"id":508,"libraryId":5,"type":15,"typeLabel":16,"stem":509,"options":510,"answer":20,"analysis":33},887189,"湖泊水质模型解析如下：. 该模型是（ ）。",[511,513,515,517],{"key":20,"text":512,"correct":29},"零维稳态模型",{"key":24,"text":514,"correct":22},"一维稳态模型",{"key":27,"text":516,"correct":22},"零维动态模型",{"key":31,"text":518,"correct":22},"一维动态模型",{"id":520,"libraryId":5,"type":15,"typeLabel":16,"stem":521,"options":522,"answer":24,"analysis":33},887190,"3个相邻城市向同一河流干流排放某种难降解污染物，干流功能区目标（类别及限值）分布如图4所示。已知干流枯水设计流量为10m3\u002Fs，在忽略悬沙吸附沉降作用、背景负荷为零的条件下，保证3个城市所有功能区达标的最大允许负荷为（ ）。",[523,525,527,529],{"key":20,"text":524,"correct":22},"14.4kg\u002FD",{"key":24,"text":526,"correct":29},"43.2kg\u002FD",{"key":27,"text":528,"correct":22},"86.4kg\u002FD",{"key":31,"text":530,"correct":22},"129.6kg\u002FD",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":27,"analysis":33},887191,"为解决某河流溶解氧超标严重的问题，可削减的污染物有（ ）。",[535,537,539,541],{"key":20,"text":536,"correct":22},"总砷",{"key":24,"text":538,"correct":22},"氨氮",{"key":27,"text":540,"correct":29},"BOD5",{"key":31,"text":542,"correct":22},"氰化物",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":24,"analysis":33},887192,"顺直均匀对称河道，采用忽略对岸反射作用的岸边排放预测模式 预测持久性污染物垂向平均浓度增量。已知河道流量为20m3\u002Fs，Mc=0.025m5\u002Fs2，在X=1000m处，河道中心浓度是排放侧岸浓度的（ ）。",[547,549,551,553],{"key":20,"text":548,"correct":22},"0.0173",{"key":24,"text":550,"correct":29},"0.368",{"key":27,"text":552,"correct":22},"0.5",{"key":31,"text":554,"correct":22},"0.632",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":24,"analysis":33},887193,"某项目设计的循环水量为25000m3\u002Fd，循环补水量为400m3\u002Fd，其他新鲜用水量为2600m3\u002Fd，该项目的水重复利用率为（ ）。",[559,561,563,565],{"key":20,"text":560,"correct":22},"0.814",{"key":24,"text":562,"correct":29},"0.893",{"key":27,"text":564,"correct":22},"0.902",{"key":31,"text":566,"correct":22},"0.986",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":24,"analysis":33},887194,"计算岸边稳定点源排放的保守污染物浓度，采用不考虑对岸边反射的二维模型： ，已知河流流量Q=100 \u002Fs，平均水深H=1m，水面宽B=250m，横向混合系数为1.0 \u002Fs，则断面最大浓度为断面通量平均浓度（M\u002FQ）的2倍的断面位置处于排放点下游的（ ）处。",[571,573,575,577],{"key":20,"text":572,"correct":22},"995m",{"key":24,"text":574,"correct":29},"1989m",{"key":27,"text":576,"correct":22},"3979m",{"key":31,"text":578,"correct":22},"5967m",{"id":580,"libraryId":5,"type":15,"typeLabel":16,"stem":581,"options":582,"answer":31,"analysis":33},887195,"某河流总磷浓度为0.20 mg\u002FL，拟建水库水体滞留时间预计为180天，假设同等流量条件及入库负荷条件下，水库建成后水库总磷浓度预计为0.15 mg\u002FL，建库将使水体类别从Ⅲ类变为（ ）。",[583,585,587,589],{"key":20,"text":584,"correct":22},"Ⅱ类",{"key":24,"text":586,"correct":22},"Ⅲ类",{"key":27,"text":588,"correct":22},"Ⅳ类",{"key":31,"text":590,"correct":29},"Ⅴ类",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":27,"analysis":33},887196,"海边码头油轮装卸作业柴油泄漏入海，环境风险事故分析中，油膜影响程度采用的分析模型是（ ）。",[595,597,599,601],{"key":20,"text":596,"correct":22},"完全混合模式",{"key":24,"text":598,"correct":22},"Streeter-Phelps（S-P）",{"key":27,"text":600,"correct":29},"P.Blokker公式",{"key":31,"text":602,"correct":22},"O’connor河口模式",{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":20,"analysis":33},887197,"已知湖泊出湖水量2亿m3\u002Fa，年均库容3亿m3，入库总磷负荷量为50t\u002Fa，出湖总磷量20t\u002Fa，湖泊年均浓度0.1mg\u002FL，据此采用湖泊稳态零维模型率定的总磷综合衰减系数为（ ）。",[607,609,611,613],{"key":20,"text":608,"correct":29},"1\u002FA",{"key":24,"text":610,"correct":22},"2\u002FA",{"key":27,"text":612,"correct":22},"3\u002FA",{"key":31,"text":614,"correct":22},"5\u002FA",[616,619,622,625,628,631],{"id":15,"name":617,"category":7,"favorite":618},"领导干部任职前廉政法规知识测试题",92,{"id":620,"name":621,"category":7,"favorite":15},595,"建筑结构与设备",{"id":623,"name":624,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":626,"name":627,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":629,"name":630,"category":7,"favorite":8},534,"BIM工程师",{"id":632,"name":630,"category":7,"favorite":8},535]