[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-573-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},573,"环境影响评价技术方法","建筑工程",0,13,50,1333,[13,34,46,58,70,82,94,106,118,130,142,153,165,177,189,201,213,225,237,249,258,270,282,294,306,314,326,338,350,362,374,386,397,409,421,433,445,457,469,481,493,505,517,529,541,553,565,577,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},886998,1,"单选题","输油管线工程建设过程中，减少工程施工对植被影响的重要措施是( )。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","加快施工进度",false,{"key":24,"text":25,"correct":22},"B","减少施工机械数量",{"key":27,"text":28,"correct":22},"C","缩短作业时段",{"key":30,"text":31,"correct":32},"D","缩小作业带宽度",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},886999,"降雨初期的地下水入渗方式主要是( )。",[38,40,42,44],{"key":20,"text":39,"correct":22},"水动力弥散",{"key":24,"text":41,"correct":22},"淋溶",{"key":27,"text":43,"correct":22},"稳定渗流",{"key":30,"text":45,"correct":32},"非饱和渗流",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},887000,"II 类一般工业固废填埋场的底部与潜水面之间的岩土层一般为( )。",[50,52,54,56],{"key":20,"text":51,"correct":22},"饱水带",{"key":24,"text":53,"correct":32},"非饱和带",{"key":27,"text":55,"correct":22},"天然隔水层",{"key":30,"text":57,"correct":22},"人工合成材料防渗层",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},887001,"我国亚热带地区分布的地带性植被类型是( )。",[62,64,66,68],{"key":20,"text":63,"correct":22},"雨林",{"key":24,"text":65,"correct":22},"针阔混交林",{"key":27,"text":67,"correct":32},"常绿阔叶林",{"key":30,"text":69,"correct":22},"落叶针叶林",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},887002,"某大型水库总库容与年入库径流量之比大于8，应用类比法预测其水文情势变化，如其他条件相似，可选择的类比水库为( )。",[74,76,78,80],{"key":20,"text":75,"correct":32},"大型径流式水库",{"key":24,"text":77,"correct":22},"大型年调节水库",{"key":27,"text":79,"correct":22},"大型多年调节水库",{"key":30,"text":81,"correct":22},"大型季调节水库",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},887003,"建设项目环境影响识别中，必须包括的阶段是( )。",[86,88,90,92],{"key":20,"text":87,"correct":22},"项目选址期",{"key":24,"text":89,"correct":32},"建设期和运营期",{"key":27,"text":91,"correct":22},"项目初步设计期",{"key":30,"text":93,"correct":22},"产业链规划期",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},887004,"化工项目生产污水处理场工艺方案应包括运行可靠性论证和( )。",[98,100,102,104],{"key":20,"text":99,"correct":32},"处理工艺的技术可行性分析",{"key":24,"text":101,"correct":22},"投资费用的来源分析",{"key":27,"text":103,"correct":22},"拟建项目的产品方案论证",{"key":30,"text":105,"correct":22},"生活污水排放量计算",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},887005,"下列物品不属于木制家具生产项目中的固体废物是( )。",[110,112,114,116],{"key":20,"text":111,"correct":22},"刨花",{"key":24,"text":113,"correct":22},"废乳胶",{"key":27,"text":115,"correct":22},"废聚醋漆",{"key":30,"text":117,"correct":32},"纤维板",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},887006,"多晶硅切片加工项目的生产工艺为硅链→剖方定位→切片→纯水清洗→电烘干，其中切片工序循环使用碳化硅及聚乙二醇切割液，产生废水的工序是( )。",[122,124,126,128],{"key":20,"text":123,"correct":22},"剖方定位工序",{"key":24,"text":125,"correct":22},"切片工序",{"key":27,"text":127,"correct":32},"清洗工序",{"key":30,"text":129,"correct":22},"烘干工序",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},887007,"某铜冶炼企业，大气环境影响评价等级为二级，非正常工况应预测( )。",[134,136,138,140],{"key":20,"text":135,"correct":32},"小时平均浓度",{"key":24,"text":137,"correct":22},"日平均浓度",{"key":27,"text":139,"correct":22},"植物生长季平均浓度",{"key":30,"text":141,"correct":22},"年平均浓度",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":33,"options":144,"answer":24,"analysis":33},887008,[145,147,149,151],{"key":20,"text":146,"correct":22},"57.1%",{"key":24,"text":148,"correct":32},"42.9%",{"key":27,"text":150,"correct":22},"28.6%",{"key":30,"text":152,"correct":22},"14.3%",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":27,"analysis":33},887009,"某自然景观距拟建高速公路的最小距离为 1200m ，按\"相对距离\"单项指标判断该景观的\"敏感程度\"为( )。",[157,159,161,163],{"key":20,"text":158,"correct":22},"极敏感",{"key":24,"text":160,"correct":22},"很敏感",{"key":27,"text":162,"correct":32},"中等敏感",{"key":30,"text":164,"correct":22},"不敏感",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":24,"analysis":33},887010,"植被调查中\"频度\"是指( )。",[169,171,173,175],{"key":20,"text":170,"correct":22},"单位面积上某种植物株数",{"key":24,"text":172,"correct":32},"群落中包含某种植物的样地数与总样地数之比",{"key":27,"text":174,"correct":22},"某种植物个体在不同样地中出现的频率",{"key":30,"text":176,"correct":22},"植物冠层垂直投影面积",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":30,"analysis":33},887011,"某市集中供热锅炉房安装5×58MW锅炉，采暖期4用1备，非采暖期一般2台运行，个别时间1台运行。单台锅炉烟气量约120000Nm3\u002Fh，采用静电除尘+湿法脱硫净化烟气，对烟囱配置的最优方案是设置（ ）。",[181,183,185,187],{"key":20,"text":182,"correct":22},"5座60m高出口直径1.6m烟囱",{"key":24,"text":184,"correct":22},"4座60m高出口直径1.6m烟囱",{"key":27,"text":186,"correct":22},"3座80m高出口直径2.0m烟囱",{"key":30,"text":188,"correct":32},"1座80m高双管集速烟囱，单管出口直径2.0m",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":20,"analysis":33},887012,"污水处理厂未封闭的油水重力分离设施释放异味物质主要源于（ ）。",[193,195,197,199],{"key":20,"text":194,"correct":32},"质量蒸发",{"key":24,"text":196,"correct":22},"空气吹脱",{"key":27,"text":198,"correct":22},"蒸汽吹脱",{"key":30,"text":200,"correct":22},"热量蒸发",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":27,"analysis":33},887013,"某乙烯裂解炉年运行时间8000小时，每年计划清焦作业5次，每次36小时，烟气排放量42000m3\u002Fh，氮氧化物浓度240mg\u002Fm3。单台裂解炉在非正常工况时年排放氮氧化物的总量是（ ）。",[205,207,209,211],{"key":20,"text":206,"correct":22},"0.01t\u002FA",{"key":24,"text":208,"correct":22},"0.36t\u002FA",{"key":27,"text":210,"correct":32},"1.81t\u002FA",{"key":30,"text":212,"correct":22},"14.51t\u002FA",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":24,"analysis":33},887014,"某企业循环水系统用水量为1000m3\u002Fh，新鲜水补水量为用水量的5%，循环水系统排水量为30m3\u002Fh，循环水利用率为（ ）。",[217,219,221,223],{"key":20,"text":218,"correct":22},"0.95",{"key":24,"text":220,"correct":32},"0.952",{"key":27,"text":222,"correct":22},"0.97",{"key":30,"text":224,"correct":22},"0.98",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":30,"analysis":33},887015,"某粉料装车安装收集处理系统，收集单元对废气的收集效率为90％，处理单元对颗粒物的处理效率为99％，则该收集处理系统的颗粒物去除效率为（ ）。",[229,231,233,235],{"key":20,"text":230,"correct":22},"0.99",{"key":24,"text":232,"correct":22},"0.945",{"key":27,"text":234,"correct":22},"0.9",{"key":30,"text":236,"correct":32},"0.891",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},887016,"在鱼道设计中必须考虑的技术参数是（ ）。",[241,243,245,247],{"key":20,"text":242,"correct":22},"索饵场分布",{"key":24,"text":244,"correct":32},"水流速度",{"key":27,"text":246,"correct":22},"河流水质",{"key":30,"text":248,"correct":22},"鱼类驯化",{"id":250,"libraryId":5,"type":15,"typeLabel":16,"stem":251,"options":252,"answer":30,"analysis":33},887017,"某拟建项目锅炉烟尘产生量为9000t\u002Fa，允许排放总量为270t\u002Fa，设计除尘效率至少应达到（ ）。",[253,255,256,257],{"key":20,"text":254,"correct":22},"0.8",{"key":24,"text":234,"correct":22},{"key":27,"text":218,"correct":22},{"key":30,"text":222,"correct":32},{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},887018,"某季节性生产的榨糖厂，每年旱季生产6个月，按照设计流量条件计算的COD允许排放量为30吨\u002F月，则核定该厂的COD总量指标为（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"90吨\u002F年",{"key":24,"text":265,"correct":32},"180吨\u002F年",{"key":27,"text":267,"correct":22},"360吨\u002F年",{"key":30,"text":269,"correct":22},"720吨\u002F年",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":30,"analysis":33},887019,"分析污染型项目生产工艺过程中水染污物产生量时，应绘制物料平衡图、水平衡图以及（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"废水处理工艺流程图",{"key":24,"text":277,"correct":22},"项目总平面图",{"key":27,"text":279,"correct":22},"水环境功能区划图",{"key":30,"text":281,"correct":32},"生产工艺流程图",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":30,"analysis":33},887020,"某新建公路拟经过国家重点保护植物集中分布地，工程方案中应优先考虑的保护措施是（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"迁地保护",{"key":24,"text":289,"correct":22},"育种种植",{"key":27,"text":291,"correct":22},"货币补偿",{"key":30,"text":293,"correct":32},"选线避让",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":30,"analysis":33},887021,"图5 工艺流程方案\" >某建设项目有两个物料分离工序，工艺流程方案见图5，合理的工艺流程有（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"方案一",{"key":24,"text":301,"correct":22},"方案二",{"key":27,"text":303,"correct":22},"方案三",{"key":30,"text":305,"correct":32},"方案四",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},887022,"化工项目生产污水处理场工艺方案应包括运行可靠性论证和（ ）。",[310,311,312,313],{"key":20,"text":99,"correct":32},{"key":24,"text":101,"correct":22},{"key":27,"text":103,"correct":22},{"key":30,"text":105,"correct":22},{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":30,"analysis":33},887023,"某煤油输送管道设计能力为12t\u002Fh，运行温度为25℃，管道完全破裂环境风险事故后果分析时，假定5分钟内输煤油管道上下游阀门自动切断，则煤油泄露事故的源强估算为（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":22},"60t",{"key":24,"text":321,"correct":22},"24 t",{"key":27,"text":323,"correct":22},"12 t",{"key":30,"text":325,"correct":32},"1 t",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":24,"analysis":33},887024,"某炼油项目填海7hm2，配套建设成品油码头及罐区，并对航道进行疏浚。施工期海域评价专题的主要评价因子是（ ）。",[330,332,334,336],{"key":20,"text":331,"correct":22},"成品油",{"key":24,"text":333,"correct":32},"悬浮物",{"key":27,"text":335,"correct":22},"重金属",{"key":30,"text":337,"correct":22},"溶解氧",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":24,"analysis":33},887025,"某煤间接液化项目年操作时间8000小时，建设10台气化炉，每年检修1次，气化炉开车时不合格粗煤气送高压火炬处理，每次持续3.5小时。单台气化炉开车时火炬产生的二氧化硫约5t\u002Fh。该项目气化炉开车二氧化硫年排放量约为（ ）。",[342,344,346,348],{"key":20,"text":343,"correct":22},"210t\u002FA",{"key":24,"text":345,"correct":32},"175t\u002FA",{"key":27,"text":347,"correct":22},"50t\u002FA",{"key":30,"text":349,"correct":22},"35t\u002FA",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":27,"analysis":33},887026,"某污水处理厂产生的污泥原始含水率为96％，欲将污泥量降为原来的10%，应将污泥的含水率降低到（ ）。",[354,356,358,360],{"key":20,"text":355,"correct":22},"0.4",{"key":24,"text":357,"correct":22},"0.5",{"key":27,"text":359,"correct":32},"0.6",{"key":30,"text":361,"correct":22},"0.7",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":20,"analysis":33},887027,"某企业年工作时间7200h，在生产过程中HCl废气产生速率为0.8kg\u002Fh，废气收集系统可将90％的废气收集至洗涤塔处理，处理效率为85％，处理后的废气通过30m高排气筒排放，则该企业HCl的无组织排放量约为（ ）。",[366,368,370,372],{"key":20,"text":367,"correct":32},"0.58t\u002FA",{"key":24,"text":369,"correct":22},"0.78t\u002FA",{"key":27,"text":371,"correct":22},"0.86t\u002FA",{"key":30,"text":373,"correct":22},"1.35t\u002FA",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":24,"analysis":33},887028,"某装置产生的废气中NH3浓度为5000mg\u002Fm3，采用两级吸收处理，一、二级对NH3的去除率依次为95％和90％。该装置外排废气中NH3浓度是（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":22},"12.5mg\u002Fm3",{"key":24,"text":381,"correct":32},"25mg\u002Fm3",{"key":27,"text":383,"correct":22},"50mg\u002Fm3",{"key":30,"text":385,"correct":22},"75mg\u002Fm3",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":27,"analysis":33},887029,"某厂现有工程SO2排放量为300t\u002Fa。扩建工程SO2产生量为200t\u002Fa，脱硫效率75％，“以新带老”削减量为75t\u002Fa。扩建工程完成后全厂SO2排放量为（ ）。",[390,391,393,395],{"key":20,"text":347,"correct":22},{"key":24,"text":392,"correct":22},"125t\u002FA",{"key":27,"text":394,"correct":32},"275t\u002FA",{"key":30,"text":396,"correct":22},"350t\u002FA",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":27,"analysis":33},887030,"某拟建项目设计排气筒高度为7.5m，二甲苯排放浓度为40mg\u002Fm3，排放速率为0.2kg\u002Fh。排放标准规定二甲苯最高允许排放浓度为70mg\u002Fm3，15m排气筒的最高允许排放速率为1.0kg\u002Fh。该排气筒二甲苯的（ ）。",[401,403,405,407],{"key":20,"text":402,"correct":22},"排放浓度超标，排放速率超标",{"key":24,"text":404,"correct":22},"排放浓度超标，排放速率达标",{"key":27,"text":406,"correct":32},"排放浓度达标，排放速率超标",{"key":30,"text":408,"correct":22},"排放浓度达标，排放速率达标",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":30,"analysis":33},887031,"某甲醇生产装置甲醇精馏单元采用三塔精馏工艺，自动控制每塔的流量。建设项目环境风险评价中，下列事故风险源项单元划分，正确的是（ ）。",[413,415,417,419],{"key":20,"text":414,"correct":22},"单塔分别作为危险单元",{"key":24,"text":416,"correct":22},"两塔组合作为危险单元",{"key":27,"text":418,"correct":22},"三塔整体作为一个危险单元",{"key":30,"text":420,"correct":32},"甲醇生产装置整体作为一个危险单元",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":27,"analysis":33},887032,"某燃煤锅炉SO2现状排放量90.0t\u002Fa。拟对锅炉增设脱硫设施，脱硫效率由现状的50%增至80%。项目技改后，SO2现状排放总量为（ ）。",[425,427,429,431],{"key":20,"text":426,"correct":22},"90.0t\u002FA",{"key":24,"text":428,"correct":22},"45.0t\u002FA",{"key":27,"text":430,"correct":32},"36.0t\u002FA",{"key":30,"text":432,"correct":22},"18.0t\u002FA",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":27,"analysis":33},887033,"采用萃取工艺生产植物油的过程中，能减少有机溶剂排放的豆瓣干燥工艺是（ ）。",[437,439,441,443],{"key":20,"text":438,"correct":22},"自然通风干燥",{"key":24,"text":440,"correct":22},"通风加热干燥",{"key":27,"text":442,"correct":32},"循环气回收干燥",{"key":30,"text":444,"correct":22},"带式通风干燥",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":30,"analysis":33},887034,"某河流拟建引水式电站，将形成6km长的减水河段。减水河段内无其他水源汇入，仅有取水口一个，取水量为2m3\u002Fs。若减水河段最小生态需水量为10m3\u002Fs，则电站至少应下放的流量为（ ）。",[449,451,453,455],{"key":20,"text":450,"correct":22},"2m3\u002Fs",{"key":24,"text":452,"correct":22},"8m3\u002Fs",{"key":27,"text":454,"correct":22},"10m3\u002Fs",{"key":30,"text":456,"correct":32},"12m3\u002Fs",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":24,"analysis":33},887035,"在建设项目环境风险评价中，识别重大危险源需根据功能单元内（ ）判断。",[461,463,465,467],{"key":20,"text":462,"correct":22},"危险物质毒性",{"key":24,"text":464,"correct":32},"危险物质数量",{"key":27,"text":466,"correct":22},"发生重大事故的概率",{"key":30,"text":468,"correct":22},"发生重大事故时对环境的危害程度",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":20,"analysis":33},887036,"下列状况中，属于项目装置区内甲苯输送管道环境风险事故的是（ ）。",[473,475,477,479],{"key":20,"text":474,"correct":32},"管道接头突发泄漏",{"key":24,"text":476,"correct":22},"输送泵控制性停车",{"key":27,"text":478,"correct":22},"管道检修探伤期间停运",{"key":30,"text":480,"correct":22},"管道被撞击弯曲变形",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":20,"analysis":33},887037,"排气筒出口内截面面积为9.62m2，烟气出口速度为20m\u002Fs，烟气出口温度为95℃，标准状态下的烟气量是（ ）。",[485,487,489,491],{"key":20,"text":486,"correct":32},"142.7Nm3\u002Fs",{"key":24,"text":488,"correct":22},"259.3Nm3\u002Fs",{"key":27,"text":490,"correct":22},"285.4Nm3\u002Fs",{"key":30,"text":492,"correct":22},"518.5Nm3\u002Fs",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":27,"analysis":33},887038,"技改扩建项目工程分析中，污染物排放量统计无需考虑的是（ ）。",[497,499,501,503],{"key":20,"text":498,"correct":22},"现有工程排放量",{"key":24,"text":500,"correct":22},"拟建工程排放量",{"key":27,"text":502,"correct":32},"区域污染源削减量",{"key":30,"text":504,"correct":22},"“以新带老”削减量",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":27,"analysis":33},887039,"在事故风险源项分析过程中，应考虑的情景包括（ ）。",[509,511,513,515],{"key":20,"text":510,"correct":22},"开、停车过程",{"key":24,"text":512,"correct":22},"环保设施发生故障",{"key":27,"text":514,"correct":32},"生产设施发生泄漏",{"key":30,"text":516,"correct":22},"正常稳定运行",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":20,"analysis":33},887040,"下列生态影响型项目工程分析内容不属于初步论证的是（ ）。",[521,523,525,527],{"key":20,"text":522,"correct":32},"环境保护措施的有效性",{"key":24,"text":524,"correct":22},"建设项目选址选线、施工布置和总图布置的合理性",{"key":27,"text":526,"correct":22},"清洁生产和区域循环经济的可行性",{"key":30,"text":528,"correct":22},"建设项目与法律法规、产业政策、环境政策和相关规划的符合性",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":20,"analysis":33},887041,"某北方城市环境空气质量二类功能区拟建集中供热锅炉，锅炉烟尘初始浓度为1800mg\u002FNm3，锅炉烟尘排放标准二类区国家限值为200mg\u002FNm3，地方限值为80mg\u002FNm3，锅炉烟气烟尘浓度达标排放需配置的除尘器效率应不低于（ ）。",[533,535,537,539],{"key":20,"text":534,"correct":32},"0.956",{"key":24,"text":536,"correct":22},"0.933",{"key":27,"text":538,"correct":22},"0.922",{"key":30,"text":540,"correct":22},"0.889",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":27,"analysis":33},887042,"某企业A车间废水量100t\u002Fd，废水水质为：pH值2.0、COD浓度2000mg\u002FL，B车间废水量也为100t\u002Fd，废水水质为：pH值6.0、COD浓度1000mg\u002FL，上述 A、B车间废水纳入污水站混合后水质为（ ）。",[545,547,549,551],{"key":20,"text":546,"correct":22},"pH值4.0、COD1500mg\u002FL",{"key":24,"text":548,"correct":22},"pH值4.0、COD1800mg\u002FL",{"key":27,"text":550,"correct":32},"pH值2.3、COD1500mg\u002FL",{"key":30,"text":552,"correct":22},"pH值3.3、COD1800mg\u002FL",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":24,"analysis":33},887043,"在建设项目环境风险评价的“源项分析”中，需计算危险化学品的（ ）。",[557,559,561,563],{"key":20,"text":558,"correct":22},"重大危险源特大事故的泄漏量",{"key":24,"text":560,"correct":32},"重大危险源最大可信事故的泄漏量",{"key":27,"text":562,"correct":22},"重大安全事故的泄漏量",{"key":30,"text":564,"correct":22},"重大危险源重大事故的泄漏量",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":24,"analysis":33},887044,"某装置产生浓度为5%的氨水1000t\u002Fa，经蒸氨塔回收浓度为15%的浓氨水300t\u002Fa，蒸氨塔氨气排放约占氨总损耗的40%，进入废水中的氨为（ ）。",[569,571,573,575],{"key":20,"text":570,"correct":22},"2t\u002FA",{"key":24,"text":572,"correct":32},"3t\u002FA",{"key":27,"text":574,"correct":22},"5t\u002FA",{"key":30,"text":576,"correct":22},"15t\u002FA",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},887045,"某项目采用甲苯作溶剂，废气中甲苯产生量100kg\u002Fh，废气采用两级净化，活性炭吸附去除率为90%，水洗塔去除率为5%，废气中甲苯最终量为（ ）。",[581,583,585,587],{"key":20,"text":582,"correct":22},"5.0kg\u002Fh",{"key":24,"text":584,"correct":32},"9.5kg\u002Fh",{"key":27,"text":586,"correct":22},"10.0kg\u002Fh",{"key":30,"text":588,"correct":22},"95.0kg\u002Fh",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":20,"analysis":33},887046,"某企业年操作时间为300d，工艺废水产生量为1000t\u002Fd，COD浓度为1000mg\u002FL，生活污水产生量为100t\u002Fd，COD浓度为300mg\u002FL，两种废水混合后送厂污水站处理，COD的去除效率为90%，处理后40%外排，该企业污水中COD的排放量为（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":32},"12.36t\u002FA",{"key":24,"text":596,"correct":22},"18.54t\u002FA",{"key":27,"text":598,"correct":22},"27.81t\u002FA",{"key":30,"text":600,"correct":22},"30.90t\u002FA",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":27,"analysis":33},887047,"某污水处理厂生化系统剩余污泥量为150m3\u002Fd，含水率99%，经浓缩后含水率降至97%，浓缩后的污泥量为（ ）。",[605,607,609,611],{"key":20,"text":606,"correct":22},"100m3\u002FD",{"key":24,"text":608,"correct":22},"75m3\u002FD",{"key":27,"text":610,"correct":32},"50m3\u002FD",{"key":30,"text":612,"correct":22},"45m3\u002FD",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]