[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887722":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":24,"analysis":25},887722,573,2,"多选题","某铁路工程施工中改变一处车站选址，整体项目竣工环境保护验收生态调查应包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","车站改址的情况",true,{"key":16,"text":17,"correct":14},"B","改址后的车站环境影响评价",{"key":19,"text":20,"correct":14},"C","设计文件中的环境保护措施落实情况",{"key":22,"text":23,"correct":14},"D","环评批复文件中生态保护措施的落实情况","ABCD","生态调查的主要内容有：①建设项目在施工、运行期落实环境影响评价文件、初步设计文件以及行业主管部门、各级环境保护行政主管部门批复文件所提生态保护措施的情况；②建设项目已采取的生态保护、水土保持措施实施效果；③开展公众意见调查，了解公众对项目建设期、施工期、运营期环境保护工作的满意度，对当地经济、社会、生活的影响；④针对建设项目已产生的环境影响或潜在的环境影响提出补救措施或应急措施。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]