[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887702":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":24,"analysis":25},887702,573,2,"多选题","减缓地下水过量开采影响的措施有（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","减少开采量",true,{"key":16,"text":17,"correct":14},"B","优化地下水开采布局",{"key":19,"text":20,"correct":14},"C","人工补给地下水",{"key":22,"text":23,"correct":14},"D","地表水和地下水联合调度","ABCD","地下水过量开采的减缓措施有：①人工补给；②调整开采井布局，必须严格限制严重超采区的地下水开采量，新辟水源地宜分散布局，控制深层地下水的开采，大力开发浅层水和合理利用微咸水，兴建大中型傍河地下水水源地，激发河流补给，自然过滤泥沙，保持稳定供水，实行供水与矿区排水相结合，有控制地开采允许利用的地下水储存量；③地下水和地表水联合调度。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]