[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887615":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},887615,573,2,"多选题","某拟建高速公路经过某种爬行动物主要活动区，公路营运期对该动物产生的直接影响有（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","减少种群数量",false,{"key":16,"text":17,"correct":14},"B","改变区系成分",{"key":19,"text":20,"correct":21},"C","阻隔活动通道",true,{"key":23,"text":24,"correct":21},"D","分割栖息生境","CD","公路运营期对该种爬行动物的直接影响是阻隔活动通道、分割栖息生境；间接影响是减少种群数量，从而改变区系成分。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术方法","建筑工程",0]