[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887523":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},887523,573,2,"多选题","大气环境影响评价等级为二级的建设项目典型气象条件下，大气环境影响预测分析与评价的内容有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","小时浓度超标率",true,{"key":16,"text":17,"correct":18},"B","小时浓度超标范围",false,{"key":20,"text":21,"correct":14},"C","日平均浓度超标率",{"key":23,"text":24,"correct":18},"D","年平均浓度超标范围","AC","大气环境影响预测分析与评价中，典型气象条件有典型小时气象条件和典型日气象条件两种情况。典型小时气象条件下，应分析项目对环境空气敏感区和评价范围的最大环境影响是否超标、超标程度、超标位置，分析小时浓度超标概率和最大持续发生时间典型日气象条件下，应分析项目对环境空气敏感区和评价范围的最大环境影响是否超标、超标程度、超标位置，分析日平均浓度超标概率和最大持续发生时间。在长期气象条件下，应分析项目对环境空气敏感区和评价范围的最大环境影响是否超标、超标程度、超标范围及位置。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术方法","建筑工程",0]