[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887517":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},887517,573,2,"多选题","大气评价等级为一级的建设项目，基本及常规气象资料分析图件应包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","年风向玫瑰图",true,{"key":16,"text":17,"correct":14},"B","风廓线图",{"key":19,"text":20,"correct":14},"C","季风向玫瑰图",{"key":22,"text":23,"correct":24},"D","小时平均风速日变化曲线图",false,"ABC","一级的建设项目基本及常规气象资料分析图件应包括年风向玫瑰图、风廓线图、季风向玫瑰图、小时平均风速月\u002F季变化曲线图等。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术方法","建筑工程",0]