[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887515":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},887515,573,2,"多选题","下列预测结果，属于大气环境影响二级评价项目预测内容的有（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","网格点小时平均最大浓度",true,{"key":16,"text":17,"correct":14},"B","关心点日平均最大浓度",{"key":19,"text":20,"correct":21},"C","关心点非采暖期平均浓度",false,{"key":23,"text":24,"correct":21},"D","网格点日平均浓度分布图","AB","要求型。《大气导则》9.8.1.2，二级评价项目预测内容：①全年逐时或逐次小时气象条件下，环境空气保护目标、网格点处的地面质量浓度和评价范围内的最大地面小时质量浓度（A）；②全年逐日气象条件下，环境空气保护目标、网格点处的地面质量浓度和评价范围内的最大地面日平均质量浓度（B）；③长期气象条件下，环境空气保护目标、网格点处的地面质量浓度和评价范围内的最大地面年平均质量浓度；④非正常排放情况，全年逐时或逐次小时气象条件下，环境空气保护目标的最大地面小时质量浓度和评价范围内的最大地面小时质量浓度。故选AB。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术方法","建筑工程",0]