[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887483":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},887483,573,2,"多选题","计算项目大气环境防护距离，需要收集的资料有（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","项目无组织排放污染物的速率",true,{"key":16,"text":17,"correct":14},"B","项目总平面布置图",{"key":19,"text":20,"correct":14},"C","项目无组织排放源达标情况",{"key":22,"text":23,"correct":24},"D","项目周边居民分布",false,"ABC","大气环境防护距离计算模式计算出的距离是以污染源中心点为起点的控制距离，并结合厂区平面布置图，确定控制距离范围，超出厂界以外的范围，即为项目大气环境防护区域。有场界无组织排放监控浓度限值的，大气环境影响预测结果应首先满足无组织排放监控浓度限值要求。如预测结果在场界监控点处（以标准规定为准）出现超标，应要求削减排放源强。计算大气环境防护距离的污染物排放源强应采用削减达标后的源强。D项，根据大气环境防护距离对无组织污染源进行环境影响分析的时候方需要了解周边居民分布。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术方法","建筑工程",0]