[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887462":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},887462,573,2,"多选题","某位于山前冲（洪）积区的项目，地下水环境影响评价工作等级为一级。现已收集近3年内一个连续水文年的枯、平、丰水期地下水水位动态监测资料。地下水环境现状评价必须进行的监测有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","开展一期地下水水位现状监测",true,{"key":16,"text":17,"correct":18},"B","开展一期基本水质因子监测",false,{"key":20,"text":21,"correct":14},"C","开展枯、丰水期基本水质因子监测",{"key":23,"text":24,"correct":14},"D","开展一期特征因子现状监测","ACD","评价等级为一级的建设项目，若掌握近3年内至少一个连续水文年的枯、平、丰水期地下水位动态监测资料，评价期内至少开展一期地下水水位监测。基本水质因子的水质监测频率在山前冲（洪）积区为枯、丰水期，若掌握近3年至少一期水质监测数据，基本水质因子可在评价期补充开展一期现状监测；特征因子在评价期内需至少开展一期现状值监测。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术方法","建筑工程",0]