[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887423":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},887423,573,2,"多选题","经现场踏勘，拟建项目厂址附近分布有5口地下水井，其中承压水井3口，潜水井2口。利用这些井位进行相应的水文、水质监测，可以确定（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","地下水质现状",true,{"key":16,"text":17,"correct":14},"B","潜水水位",{"key":19,"text":20,"correct":21},"C","潜水流向",false,{"key":23,"text":24,"correct":21},"D","承压含水层与潜水层之间的水力联系","AB","由于潜水井只有2口，无法确定潜水流向，排除C项；仅有水位也无法确定承压含水层与潜水层之间的水力联系，还必须通过对隔水层岩性的分析，是否是弱透水层，排除D项。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术方法","建筑工程",0]