[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887420":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},887420,573,2,"多选题","分析企业自建污水处理站总平面布置的合理性，应考虑的因素有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","常年主导风向",true,{"key":16,"text":17,"correct":18},"B","企业发展规划",false,{"key":20,"text":21,"correct":14},"C","建筑物之间的距离",{"key":23,"text":24,"correct":18},"D","受纳水体水质","AC","污水处理厂（站）总平面布置的要求包括：①处理构筑物应尽可能按流程顺序布置，应将管理区和生活区布置在夏季主导风向上风侧，将污泥区和进水区布置在夏季主导风向下风侧；②处理构筑物的间距应以节约用地、缩短管线长度为原则，同时满足各构筑物的施工、设备安装和各种管道的埋设、养护维修管理的要求，并按远期发展合理规划；③污泥处理构筑物的布置应保证运行安全、管理方便，宜布置成单独的组合；④污泥消化池与其他处理构筑物的间距应大于20m，储气罐与其他构筑物的间距应根据容量大小按有关规定确定，具体设计要求应符合《城镇燃气设计规范》（GB 50028）的规定。@##",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术方法","建筑工程",0]