[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887410":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},887410,573,2,"多选题","某沿海经济开发区建设30万吨级原油码头项目，可能对海洋环境产生影响的阶段有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","水文调查期",false,{"key":16,"text":17,"correct":18},"B","建设施工期",true,{"key":20,"text":21,"correct":14},"C","生物调查期",{"key":23,"text":24,"correct":18},"D","正常运行期","BD","海洋工程在建设、运行期间，通常可能发生事故或者其他突发性事件，造成海洋环境污染。本题中，“30万吨级原油码头建设项目”属于海洋工程，可能对海洋环境产生影响的阶段有建设施工期和正常运行期。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术方法","建筑工程",0]