[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887398":3},{"question":4,"library":27},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":25,"analysis":26},887398,573,2,"多选题","在污染型项目生产工艺流程图中可以标识出（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","主要产污节点",true,{"key":16,"text":17,"correct":18},"B","清洁生产指标",false,{"key":20,"text":21,"correct":14},"C","污染物类别",{"key":23,"text":24,"correct":18},"D","污染物达标排放状况","AC","一般情况下，工艺流程应在设计单位或建设单位的可研或设计文件基础上，根据工艺过程的描述及同类项目生产的实际情况进行绘制。环境影响评价工艺流程图有别于工程设计工艺流程图，环境影响评价关心的是工艺过程中产生污染物的具体部位，污染物的种类和数量。所以绘制污染工艺流程应包括涉及产生污染物的装置和工艺过程，不产生污染物的过程和装置可以简化，有化学反应发生的工序要列出主要化学反应和副反应式。并在总平面布置图上标出污染源的准确位置，以便为其他专题评价提供可靠的污染源资料。",{"id":6,"name":28,"category":29,"favorite":30},"环境影响评价技术方法","建筑工程",0]