[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887341":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},887341,573,1,"单选题","环境空气质量不达标区域，已实施区域限期达标规划，建设项目应采取（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","经济合理的环境保护措施",false,{"key":16,"text":17,"correct":14},"B","技术可行的环境保护措施",{"key":19,"text":20,"correct":21},"C","国内外先进可行的环境保护措施",true,{"key":23,"text":24,"correct":14},"D","满足长期达标排放的环境保护措施","环境质量不达标的区域，应采取国内外先进可行的环境保护措施，结合区域限期达标规划及实施情况，分析建设项目实施对区域环境质量改善目标的贡献和影响。故选C。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]