[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887303":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},887303,573,1,"单选题","编制环境影响报告书的建设项目，建设单位应当向公众公开全本报告书的时间是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","征求公众意见前",false,{"key":16,"text":17,"correct":18},"B","交环境保护主管部门报审前",true,{"key":20,"text":21,"correct":14},"C","环境保护主管部门受理后",{"key":23,"text":24,"correct":14},"D","环境管理部门批复后","《建设项目环境影响评价政府信息公开指南（试行）》（环办[2013]103号）规定了报告书公开的内容及时间。建设单位在向环境保护主管部门提交建设项目环境影响报告书、表前，应依法主动公开建设项目环境影响报告书、表全本信息，并在提交环境影响报告书、表全本同时附删除的涉及国家秘密、商业秘密等内容及删除依据和理由说明报告。环境保护主管部门在受理建设项目环境影响报告书、表时，应对说明报告进行审核，依法公开环境影响报告书、表全本信息。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]