[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887206":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},887206,573,1,"单选题","某重大危险源泄漏事故的风险评价，将该事故排放源概化为间隔1小时的等强度瞬时点源（t=0，1h）排入河中。采用瞬时点源河流一维动态水质模型预测t=22h时的沿程增量浓度见下表，则该时刻河道污染物浓度最大增量断面距排放源的距离约为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","6800m",false,{"key":16,"text":17,"correct":18},"B","7200m",true,{"key":20,"text":21,"correct":14},"C","7600m",{"key":23,"text":24,"correct":14},"D","8000m","采用瞬时点源河流一维动态水质模型预测时，在距离间隔1小时的等强度瞬时点源下游x处的污染物浓度峰值为t=0，1h源贡献浓度的叠加值，即6400m处的叠加值=4.8+4.3=9.1（mg／L），6800m处的叠加值=5.0+4.8=9.8（mg／L），7200m处的叠加值=4.9+5.2=10.1（mg／L），7600m处的叠加值=3.3+5.2=8.5（mg／L），8000m处的叠加值=2.7+5．1=7．8（mg／L）。则该时刻河道污染物浓度最大增量断面距排放源的距离约为7200m。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]