[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-887031":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},887031,573,1,"单选题","某甲醇生产装置甲醇精馏单元采用三塔精馏工艺，自动控制每塔的流量。建设项目环境风险评价中，下列事故风险源项单元划分，正确的是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","单塔分别作为危险单元",false,{"key":16,"text":17,"correct":14},"B","两塔组合作为危险单元",{"key":19,"text":20,"correct":14},"C","三塔整体作为一个危险单元",{"key":22,"text":23,"correct":24},"D","甲醇生产装置整体作为一个危险单元",true,"源项分析的步骤中，通常按功能划分建设项目工程系统，一般建设项目有生产运行系统、公用工程系统、储运系统、生产辅助系统、环境保护系统、安全消防系统等。将各功能系统划分为功能单元，每一个功能单元至少应包括一个危险性物质的主要贮存容器或管道。并且每个功能单元与所有其他单元有分隔开的地方，即有单一信号控制的紧急自动切断阀。因此，本题中需将甲醇生产装置整体作为一个危险单元。",{"id":6,"name":27,"category":28,"favorite":29},"环境影响评价技术方法","建筑工程",0]